Laserfiche WebLink
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Wednesday, December 15, 2010 11:58 AM <br /> To: 'Joey Pace' <br /> Subject: RE: Question Regarding Well Destruction Variance <br /> please 'sound' the wells to verify total depth/'plastic bottom'/ unobstructed first. <br /> based on what you find, I will review your proposal to either pressure grout, pull the casing out <br /> and ream out the hole, or just overbore. <br /> Pressure grout is limited to known construction, unobstructed, and NOT in an area of <br /> contamination. ALL of these concerns must be adequately addressed before I issue a permit. <br /> for your info, the permit application is $366 and each well is $122. Two well permit, if ON ONE <br /> PARCEL will be $610. <br /> Mike Infurna <br /> From: Joey Pace [mailto:jpace@ecostmanage.com] <br /> Sent: Wednesday, December 15, 2010 11:44 AM <br /> To: Mike Infurna [EH] <br /> Subject: Question Regarding Well Destruction Variance <br /> Mike: <br /> I am preparing a well destruction permit application for the two VE wells located when Nuel Henderson <br /> was in the field with ECM on Tuesday, December 14, 2010. 1 have one question which I wanted to clarify <br /> with you before submitting the application: <br /> 1. Would it be acceptable for us to request a variance on the application from Well Destruction <br /> Ordinance Code§13.17.6(overdrilling) so we may instead pressure grout these wells in <br /> accordance with §6.3.3 and §6.3.4? We would like to request this variance because both of these <br /> vapor wells are shallower than 100' and terminate above groundwater(26.5 feet for both),and <br /> were never used as groundwater monitoring wells. We understand this variance, if granted, is <br /> only applicable if the wells are found to be clear of obstructions, or can be cleared prior to <br /> grouting. <br /> With the permit application, ECM will include the fee of$488,the MFR form,the LCD form,well map, <br /> borings logs, and copy of access agreement. <br /> Thank you very much, Mike. <br /> Joey Pace, Project Geologist <br /> Environmental Cost Management Inc. <br /> Direct Number:480-699-3087 <br /> (Mountain Time Zone) <br /> 12/20/2010 <br />