Laserfiche WebLink
Page 2 of 4 <br /> week of Dec 7th will be in Stanislaus County. <br /> 3. Starting Monday December 14th: I will be drilling M-50A and M-51A (one permit) and M- <br /> 52B and M-53B (one permit); <br /> 4. Possible that week, if the wells are completed, or starting week Dec 211t, abandonments <br /> (three permits). <br /> Week of December 14th: Starting that Monday at 230 Industrial with M-50A and M-51A. Then on <br /> to 519 S. Stockton later that week for M-52B and M-53B. Someone will have to call you with <br /> notice regarding the exact start dates for the abandonments. We stalled too long and were not <br /> able to book a second rig to start on the 14th, so they will be completing the abandonments after <br /> the well installations. <br /> Please feel free to call with questions or let me know if you need anything else sent to complete <br /> the permits (besides that City permit). <br /> Joey Pace <br /> ECM, Inc. <br /> 714-591-5364 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, December 02, 2009 1:40 PM <br /> To: Joey Pace <br /> Cc: Vicki McCartney [EH] <br /> Subject: RE: ECM Permits sent to SJCEHD <br /> I've been OT early and late since Monday and I just got back to the office. <br /> I have been tasked with the permits for this site and I will be issuing as many of <br /> the six permits I find time to do. If I can't finish, Victoria McCartney <br /> vmccartney s'cehd.com will help me out. <br /> I got one issued for MW-50A and MW-51A. <br /> I'll do my best today (Wednesday) to get the INSTALLATION one for Fifth <br /> street issued as you have requested. <br /> Vicky will be covering for me Dec 7 since I have to be in Sac for a <br /> deposition/subpoena. I should be the field inspector for this phase from Dec 8 <br /> on. <br /> rest assured, the EHD has prioritized this site for start Dec 7. <br /> it would be very helpful if you were able to share with me the field schedule you <br /> have with your driller for exactly which work will be done on which day. Please <br /> email both Vicky and myself with this info and any OTHER information on start <br /> time, place, etc. <br /> hopefully this will smooth out after the permits have been issued and I"m back <br /> to the field inspections. <br /> thank you. <br /> 12/2/2009 <br />