My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> CLEANUP AND ABATEMENT ORDER NO.R5-2006-0720 <br /> NESTLE USA,INC. <br /> RIPON,SAN JOAQUIN COUNTY <br /> recommendations to address them. Within 30 days of receipt of Regional Board staff comments on <br /> the Draft Report, submit the Final Updated Site Conceptual Model Report. <br /> 6. By 15 September 2006, submit a Draft Lower Aquifer Zone Investigation Work Plan for Regional <br /> Board staff review. The Draft Work Plan shall provide a detailed sampling program to investigate <br /> the recent increasing TCE and cis-1,2-DCE concentrations in Lower Aquifer monitoring wells and <br /> delineate the full extent of the TCE plume in the Lower Aquifer. The sampling program shall <br /> include collection of groundwater samples from all depths of the Lower Aquifer Zone impacted by <br /> the Discharger's plume and installation of new wells to monitor both horizontal and vertical <br /> movement of the plume. The new well installations shall include wells to monitor potential vertical <br /> migration near source area monitoring wells M-613 and M-813 to deeper portions of the Lower <br /> Aquifer Zone. Within 15 days of receipt of Regional Board staff comments on the Draft Work Plan, <br /> submit the Final Lower Aquifer Zone Investigation Work Plan. <br /> 7. Within 150 days of receiving concurrence from Regional Board staff on the Final Lower Aquifer <br /> Zone Investigation Work Plan, complete all actions specified in the Final Work plan and submit the <br /> Draft Lower Aquifer Zone Investigation Report. Within 30 days of receipt of Regional Board staff <br /> comments on the Draft Lower Aquifer Zone Investigation Report, submit the Final Lower Aquifer <br /> Zone Investigation Report. <br /> 8. By 13 November 2006,the Discharger shall complete assessment of potential vapor intrusion into <br /> buildings overlying the TCE plume and submit a Final Report, addressing all Regional Board staff <br /> comments on the Indoor Air Vapor Intrusion Risk Evaluation Report and the Soil Gas Survey Work <br /> Plan. <br /> 9. By 30 November 2006, complete installation of a monitoring well cluster west of monitoring well <br /> cluster M-32 and at or down gradient of the edge of the TCE plume. <br /> 10.By 30 November 2006, complete installation of guard wells between the Discharger's source areas <br /> and City of Ripon supply wells MW-13 and MW-14. <br /> Feasibility Study and Cleanup <br /> 11. By 30 July 2006, begin pumping existing extraction wells at design rates or the maximum disposal <br /> rate permitted to the City of Ripon's industrial sewer. <br /> 12. By 15 October 2006, submit the Draft Revised Groundwater Model Report detailing the final model <br /> calibration and simulations of pumping scenarios that will provide full containment and cleanup of <br /> the TCE plume originating from the former Nestid facility. The simulated pumping scenarios, at a <br /> minimum, shall include full capture of the TCE plume(including degradation products)that exceeds <br /> MCLS (scenario 1) and full capture of the plume that exceeds a concentration of 0.5 gg/L(scenario <br /> 2). Within 60 days of receiving Regional Board staff comments on the Draft Model Report, submit <br /> the Final Revised Groundwater Model Report. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.