My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT ORDER NO. R5-2006-0720 <br /> NESTLE USA,INC. <br /> RIPON,SAN JOAQUIN COUNTY <br /> 13. By 15 December 2006,the Discharger shall submit a Draft Evaluation of Long-Term Treated <br /> Groundwater Disposal Alternatives Report. The Draft Report shall assess feasible alternatives for <br /> disposing of the treated groundwater generated by the existing extraction wells operating <br /> continuously at their maximum pumping rates and any additional extraction wells that the Final <br /> Groundwater Model indicates are necessary to provide full containment of the Discharger's plume. <br /> In accordance with the Regional Board's Basin Plan,the Draft.Report should include an evaluation <br /> of available reuse and land discharge options as potential disposal methods. The Draft Report shall <br /> select one or more of the disposal alternatives and provide a schedule to implement any necessary <br /> construction of new groundwater treatment/disposal facilities or alterations to existing groundwater <br /> treatment facilities. Within 30 days of receiving staff comments on the Draft Evaluation of Treated <br /> Groundwater Disposal Alternatives Report,the Discharger shall submit the Final Evaluation of <br /> Treated Groundwater Disposal Alternatives Report. <br /> 13. By 30 June 2007, implement interim remedial actions to contain/capture the TCE plume in the <br /> Lower Aquifer Zone that exceeds Maximum Contaminant Levels. The final groundwater remedies <br /> proposed in the RAP/ROD shall consider the entire TCE plume. <br /> 14. By 30 June 2007, the Discharger will implement remedial actions to fully contain/capture the TCE <br /> plume in the Upper Aquifer Zone originating from the Industrial Avenue and Stockton Avenue <br /> source areas and inhibit downward migration of the TCE plume from the Upper Aquifer. <br /> 15.By 31 March 2007,the Discharger shall submit the Draft Remedial Action Plan/Record of Decision <br /> (Draft RAP/ROD). Any additional addendums or revisions to the 1994 Feasibility Study Report that <br /> are needed to support the selected remedies in the Draft RAP/ROD must be submitted and approved <br /> by Board staff at least 30 days before this date. <br /> 16. Within 45 days of receiving comments from Board staff on the Draft RAP/ROD,the Discharger <br /> shall submit the Draft Final RAP/ROD addressing Regional Board staff comments. <br /> 17. Concurrent with submittal of the Draft Final RAP/ROD, the Discharger shall submit a Draft Fact <br /> Sheet for review by Regional Board staff. <br /> 18.Within 15 days off receiving comments from Board staff on the Draft Fact Sheet,the Discharger <br /> shall address all Regional Board staff comments and mail the Final Fact Sheet to the Ripon <br /> Community. <br /> 19. Within 30 days of mailing the Final Fact Sheet,the Discharger shall, in conjunction with Board <br /> staff, hold a public meeting to discuss the proposed remedial action plan. <br /> 20. Within 60 days after holding the public meeting,the Discharger shall submit the Final RAP/ROD <br /> for approval, which includes responses to public comments. <br /> 21. Within 60 days after submission of the Final RAP/ROD the Discharger shall submit the Draft <br /> Groundwater Remedial Design Plan. Within 60 days of receiving staff comments on the Draft <br /> Groundwater Remedial Design Plan, the Discharger shall submit the Final Remedial Design Plan. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.