My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> CLEANUP AND ABATEMENT ORDER NO. R5-2006-0720 <br /> NESTLE USA,INC. <br /> RIPON, SAN JOAQUIN COUNTY <br /> 22. Within 120 days of Board staff approval of the Final Groundwater Remedial Design Plan, submit a <br /> report describing the status and results of the remedial work(Cleanup Implementation Report). The <br /> report shall also clearly show whether the installation of any remediation system is complete, and if <br /> not, give a schedule and proposed work plan for installation and monitoring of the remaining <br /> remedial activities. <br /> 23. Within 240 days of receiving concurrence with the Final Groundwater Remedial Design Plan, the <br /> Discharger shall have completed any necessary pilot testing and construction, and shall be operating <br /> all elements of the final remedy in accordance with the Plan. <br /> Groundwater Monitoring <br /> 24. Conduct monitoring of the existing wells and any additional wells in accordance with MRP No. R5- <br /> 2005-0829 or any revised MRP approved by the Executive Officer. <br /> Operation of Groundwater Treatment Plants <br /> 25. The Discharger shall operate and maintain the Stockton Avenue and Industrial Avenue groundwater <br /> treatment plants, and any future groundwater treatment plants constructed by the Discharger, in <br /> accordance with MRP No. R5-2005-0829 or a revised MRP or new Waste Discharge Requirements <br /> Order issued by the Executive Officer. The Discharger shall remove all VOCs from its extracted <br /> groundwater prior to discharge to the City of Ripon's non-potable water system or future percolation <br /> ponds constructed by the Discharger. In lieu of a Waste Discharge Requirements Order issued by <br /> the Executive Officer, the Discharge shall comply with the following effluent limits: <br /> Daily Maximum Monthly Median <br /> Total VOCs 1.0 µg/L 0.5 pg/L <br /> Public Participation <br /> 26. By 15 August 2006, submit a Draft Fact Sheet for Regional Board staff review that presents the <br /> findings of the plume investigation on the south side of the Stanislaus River. Within 7 days of <br /> receipt of Regional Board staff comments, issue a Final Fact Sheet addressing all comments and <br /> providing the date/time/location for a public meeting. At least 15 days prior to the proposed meeting <br /> the Final Fact Sheet shall be posted in the local post office and town hall and mailed to all local <br /> private well owners identified by the Phase 1 and 2 Well Surveys on the south side of the Stanislaus <br /> River. Within 30 days of issuing the Final Fact Sheet, hold a public meeting to present the findings <br /> of the plume investigation on the south side of the Stanislaus River. <br /> 27. By 31 October 2006, submit a Public Participation Plan. The Public Participation Plan shall <br /> solicit the public's concerns and disseminate information to the public regarding the investigation <br /> and proposed cleanup activities at the sites. The Public Participation Plan shall be updated as <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.