My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The ends of the slotted pipe shall be machined with <br /> threads which are compatible with those of the blank PVC <br /> well casing of similar schedule. All threads shall be <br /> machined so that when joined, the joint formed is flush <br /> with the outside diameter of the casing. <br /> D. All slotted pipe shall be new and shall be decontaminated <br /> prior to installation using the same procedures as used <br /> for blank casing. The cost for decontamination shall be <br /> included in the subcontractor's price to furnish the well <br /> screen. <br /> 11.3 Formation Stabilizer. Contractor shall provide a suitable <br /> formation stabilizer for filling the annulus around well <br /> screens. This material shall consist of clean, 6x20 size <br /> Monterey Silica Sand or equivalent as approved by the <br /> Engineer. <br /> 11.4 Caps and Protective Covers. Contractor shall provide end caps <br /> for top and bottom of all wells. For all of the wells, the <br /> Contractor shall supply 6-5/8 inch locking steel protective <br /> well covers in 5—foot lengths. For all of the wells, the <br /> Contractor shall also provide locking protective Christy, or <br /> equivalent, locking covers which are flush with ground level. <br /> 11.5 Bentonite Seal. Contractor shall provide bentonite pellets as <br /> manufactuerd by Slope Indicator Company, or equivalent as <br /> approved by the Engineer. <br /> 11.6 Cement Grout. Contractor shall provide Portland Type I/II <br /> Cement Grout and equipment for mixing. The mixing equipment <br /> must have a minimum capacity of 300 gallons. <br /> 11.7 Payment. Contractor will be paid for materials at the unit <br /> rates quoted in Contractor's proposal. <br /> 5 <br /> 1130.3:14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.