Laserfiche WebLink
i • <br /> ATTACHMENT <br /> CONTRACTOR'S COST PROPOSAL <br /> Being familiar with all technical requirements, the undersigned Bidder hereby proposes to <br /> furnish all labor, materials, tools, supplies, equipment, plant, transportation, and all other <br /> necessary items for the completion of the Work; pay all taxes and patent costs; and perform <br /> the Work in accordance with the requirements of this Document, including specifications and <br /> drawings for an in consideration of the following unit prices: <br /> Item No. Estimated Quantity Description of Work to be Total Price (Figures) for <br /> Performed with Price in Words Specified Work <br /> 1. Lump Sum Mobilization, Demobilization <br /> Lump Sum <br /> 2. 500 lin. ft. Drill nominal 10-inch diameter <br /> borehole for exploratory boring <br /> and monitoring wells <br /> $ $ <br /> Per foot <br /> 3. 1 borehole Electric Log Exploratory <br /> Boring <br /> Per borehole <br /> 4. 20 lin. ft. Furnish 4-inch ID, threaded <br /> Sch. 40 PVC screen, .010 inch <br /> slot size, 10 foot joints <br /> Per foot <br /> 5. 40 lin. ft. Furnish 5-inch ID, Sch. 80 <br /> threaded PVC screen 0.010 slot <br /> size, 10-foot lengths <br /> Per foot <br /> 6. 100 lin. ft. Furnish 4-inch ID, threaded, <br /> PVC, Sch. 40 blank casing <br /> Per foot <br /> 20598/091592.Rpt <br /> '1- <br />