Laserfiche WebLink
NESTLE FOODS CORPORATION <br /> C CTOR GUIDELINES <br /> garER�L <br /> All construction personnel shall anter pestle's premises <br /> through the main security pate or construction pate if <br /> one is so designated, but not Doth. pestle's security <br /> will issue all construcion personnel a security badge, <br /> require each person to sign in by ccimpleting columns It <br /> 3, 4 and 10 on pestle's Construction Security Log (see <br /> attachment A) . Ito construction personnel will be allowed <br /> on our property unless the above steps have been com- <br /> pleted. <br /> All construction personnel must report to the plant Ingi- <br /> neer, or bis designee, at the start of each workday. <br /> Construction workers personal vehicles should be parked <br /> In parking lot West of Industrial Avenue across the <br /> street from the guard shack. <br /> Contractor's pickups and trucks may be brought on the job <br /> site. However, they should be kept in close proximity to <br /> their work area and should always be available for ins- <br /> pection upon request of plant Kanagement or Security <br /> guard. Contractor personnel shall also cooperate with <br /> Nestle's lunch pail inspection program. <br /> Alcoholic beverages or persons under the influence of <br /> liquor will not be permitted on Company premises. <br /> Carrying drugs (not prescribed by a physician) or report- <br /> ing to work while under the influence of such drugs will <br /> not be permitted. <br /> Bringing cameras, firearms, or weapons of any kind onto <br /> the premises is Dot permitted. <br /> Construction personnel should remain in the area tbair <br /> work requires and Dot visit other parts of the pleat. <br /> Company s.ssumes no responsibility for Contractor's tools. <br /> Keep tbem locked up when you are not using them. <br /> All construction personnel Lust report to pestle's <br /> Security. If they must temporarily leave and return dur- <br /> tag the course of their workday these employees will be <br /> required to complete columns 11 through 14 on pestle's <br /> Construction Security Log (see attacbment A) as approp- <br /> riate and identify reason for leaving premises. <br /> All construction personnel must report to the Plant <br /> tngineer, or his designees at the end of each workday. <br />