Laserfiche WebLink
.I • dh <br /> • <br /> CONTRAMR GUIDELINES (continued) <br /> All construction personnel roust report to Nestle's <br /> Security at end of each workday to return their Security <br /> badge , complete columns 11 through 14 on Nestle's Con- <br /> struction Security Log as appropriate, and sign their <br /> name in column 2. . <br /> All time and material work oust be documented with the <br /> f ollwing t <br /> 2. ) Nestle foods Corporation Daily Tine Sheet <br /> (see attachment b) . <br /> 2. ) Nestle foods Corporation Daily Materials <br /> Sheet (see attachment C) . <br /> All Daily Time Sheets and Daily Materials Sheets must be <br /> completed daily, and be signed by a designated represen- <br /> tative of Nestle foods Corporation and the Contractor. <br /> Mork closely with the Nestle engineers on all projects. <br /> Do not sake changes or take shortcuts without approval. <br /> Less than professional work will not be accepted. <br /> ILLING <br /> All invoices must identify Nestle's purchase order <br /> number. <br /> Tor time and materials work, Nestle foods Corporation <br /> Daily Time Sheets and Daily Materials Sheets must be <br /> attached to all invoices. (Note: The Daily Time <br /> Sheets and Katerials Sheets will not be accepted as <br /> valid unless they have been signed by an authorised <br /> Nestle representative) . <br /> Sourly labor rates must be submitted to Nestle foods <br /> Corporation on our "Contractors Time and Materials <br /> Schedule". If you have not already completed this <br /> form please complete one form for each trade and return <br /> It to us as soon as possible. If a rate change becomes <br /> necessary, you must notify Nestle foods in writing 30 <br /> days prior to the effective date of the rate change. <br /> fourl7 labor rates and Lours of work are to be sbo n an <br /> your invoices for each trade. <br /> • Invoices are not to exceed the original purchase order <br /> titialess a field Change Order to on file. <br /> 5A1t1TATICV <br /> • food sanitary design principles should be followed on <br /> all new installation work that is done by you. <br />