Laserfiche WebLink
s <br /> SCOPE OF WORK <br /> 1.0 Safety Plan <br /> Contractors should prepare and submit a site specific health and safety plan (SSHSP) in <br /> accordance with local, state, and federal regulations. The purpose of the SSHSP will be to <br /> address the side specific work scope, outline the specific hazardous involved and provide all <br /> necessary measures to complete the project in a safe professional manner. The work is <br /> expected to be performed under Lever "D" Health and Safey Conditions. <br /> 2.0 Well Installation <br /> Three (3) SVE wells need to be installed in the impacted soil near the former Decaffination <br /> Building as shown in Figure 1. The extraction wells will be located based upon an anticipated <br /> radius of influence of 30-50 feet for each well. One of the SVE wells should be installed using <br /> angled drilling techniques underneath the Industrial Ave.. <br /> A. Borehole Construction <br /> The SVE wells should be constructed using a continuous core hollow stem auger. All wells <br /> should be constructed of four-inch (4") diameter, Schedule 40 PVC pipe. To provide for sufficient <br /> filter pack, the four-inch wells should be constructed using hollow stem augers of at least ten <br /> inch (10") diameter. Boreholes should be advanced to approximately 25 feet below ground <br /> surface. <br /> B. Well Construction <br /> The SVE wells should be constructed using four-inch (4") diameter, schedule 40 PVC flush thread <br /> well screen and a bottom plug. The well screen should consist of 0.020-inch slotted pipe which <br /> will be installed from 8 to 25 feet bgs. A four-inch diameter, schedule 40 PVC flush thread blank <br /> well casing should be installed as a riser from the top of the well screen to the surface in each <br /> well. The required well speciation is as follows, <br /> (2) Ea. 25' x 4" <br /> (1) Ea. 40' x 4" <br /> The screened interval in the wells should be sand packed using #2/20 washed and sorted sand <br /> from total depth to approximately one foot above the top of the screen The sand pack should <br /> be followed by approximately one foot of bentonite chips and then bentonite grout to seal the <br /> wells from surface infiltration. All materials should be introduced into the wellbore from the <br /> surface through the annular space between the auger and well casing. <br /> C. Decontamination <br /> All construction equipment that is used below the ground surface or that may come in contact <br /> with potentially contaminated materials should be steam-cleaned prior to initial use and after <br /> each use. This includes drill bits, drill piper, auger flights, drilling tools, samplers, and core <br /> barrels. All soil sampling equipment should be decontaminated according to the following <br /> procedure: <br /> 1. Wash with dilute solution of non-phosphate soap. <br /> 2. Rinse with potable water. <br /> 3. Final rinse with distilled water. <br />