Laserfiche WebLink
Interim Remedial Action 19 March 1999 <br /> Nestle Beverage Company <br /> 6. The Work Plan should be amended and include a capture zone analysis for extraction well E-2.A <br /> site map should be provided showing the location of E-2,the TCE plume in the B/A aquifer <br /> zones and the anticipated radius of influence for extraction well E-2. The capture zone analysis <br /> should be based on the most recent (updated) groundwater flow modeling effort. An <br /> amendment to the Work Plan should be provided to us no later than 15 April 1999. <br /> If youhave-aVquesti ase call me at (916) 255-33050. <br /> ROBERT REEVES <br /> Associate Engineering Geologist <br /> RR:rrr <br /> cc: Rick Thomaser,IT Group, Martinez <br /> Jean Mom, IT Group, Martinez <br /> Ron Rowe, San Joaquin County Public Health Services-Environmental Health Division <br />