Nestle USA, Inc., Ripon, California March 26, 2014
<br /> 2013 Annual Report
<br /> 7 ENDNOTES
<br /> 1 California Regional Water Quality Control Board — Central Valley Region, Final Groundwater
<br /> Monitoring and Reporting Program R5-2010-0810, Former Nest16 USA, Inc. Facility Ripon,
<br /> San Joaquin County, April 19, 2010.
<br /> 2 Environmental Cost Management, Inc. 2013 Monitoring Well Installation Report (M-55A, M-
<br /> 56A, and M-57A), Former Nestle USA, Inc. Facility Ripon, CA. March 29, 2013.
<br /> 3 Environmental Cost Management, Inc. M-10A 2011 Investigation Report, Former Nest16
<br /> USA, Inc. Facility Ripon, CA. March 29, 2012
<br /> 4 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA,
<br /> Inc. Facility Ripon, CA. January 29, 2011.
<br /> 5 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA,
<br /> Inc. Facility Ripon, CA. January 29, 2011.
<br /> 6 Geomatrix Consultants. Updated Site Conceptual Model Report, Former Nestle Facility,
<br /> Ripon, California. January 30, 2009.
<br /> Environmental Cost Management, Inc., Interim Remedial Action Plan for 230 Industrial
<br /> Avenue, Former Nestle USA, Inc. Facility, Ripon, CA - 95366. August 2007
<br /> 8 Environmental Cost Management, Inc. Facility Interim Remedial Action Plan, Groundwater
<br /> Extraction System Startup Report. April 4, 2008.
<br /> 9 Environmental Cost Management, Inc. Industrial Avenue Facility Interim Remedial Action
<br /> Plan, Well Installation and Aquifer Test Report. February 4, 2008.
<br /> 10 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA,
<br /> Inc. Facility Ripon, CA. January 29, 2011.
<br /> 11 Environmental Cost Management, Inc., 2010 Revised Water Replacement Contingency
<br /> Plan, Former Nest/6 USA, Inc. Facility, 230 Industrial Avenue, Ripon, California 95366.
<br /> September 13, 2010.
<br /> 12 Radian International. Interim Final Guide to Optimal Groundwater Monitoring. Prepared for
<br /> the Naval Facilities Service Center, Port Hueneme, California. January 2000.
<br /> 13 Environmental Cost Management, Inc. Final Groundwater Model Report. June 12, 2007.
<br /> 24
<br />
|