Laserfiche WebLink
Nestl6 USA, Inc., Ripon, California March 26, 2014 <br /> 2013 Annual Report <br /> 10. Implement MNA work plan; <br /> 11. Destroy any newly discovered conduit well; <br /> 12. Relocate three transducers to monitor the effect of MW-3 pumping; <br /> 13. Continue groundwater monitoring, sampling, and reporting per the MRP and in <br /> accordance with approved MRP amendments; <br /> 14. Continue implementation of Water Replacement Contingency Plan; <br /> 15. Conduct quarterly well inspections during each sampling event; <br /> 16. Install a larger treatment system at 802 Vera Avenue contingent upon removal of <br /> treatment system located at 5725 Hall Road; <br /> 17. Update the Well Inventory Report, as necessary; <br /> 18. Continue trend analysis for selected wells to monitor trends and take action as <br /> warranted; and <br /> 19. Conduct stakeholder meetings with the RWQCB, the City of Ripon, Diamond Pet <br /> Food, Ripon Co-gen, and Modesto Irrigation District, to provide an ongoing forum for <br /> discussing local water quality and supply issues. <br /> 23 <br />