Laserfiche WebLink
M <br /> RAMAGE ENVIRONMENTAL IDIECIEE IFED <br /> j Site Health and Safety Plan NOV 2 8 2000 <br /> ENVIRONMENT HEALTH <br /> I. GENERAL INFORMATION PERMIT/SERVICES <br /> Date: November 28, 2000 <br /> Project Name: San Joaquin County Parking Garage <br /> Project Site Location: 130 North Hunter Street, Stockton, California <br /> Client Contact: Ms. Kerry Wasson Phone: (209) 468-9625 <br /> Facilities Management <br /> San Joaquin County <br /> Project Manager: Joseph Ramage qnA1 I Date: ik l z g 100 <br /> The Project Manager is responsible for all onsite activities, including having all appropriate plans <br /> prepared and distributing the plans to field personnel and to authorized representatives of each <br /> subcontractor employed to perform work on site.. The Project Manager is also responsible for <br /> ensuring that the provisions of the Health and Safety Plan (HSP) are carried out. This includes <br /> ensuring that all field personnel have received adequate training, that an adequate supply of <br /> safety and emergency equipment is available. <br /> Designated Site Safety Officers: Joseph Ramage _ Date : kkl2sivo <br /> i <br /> The Site Safety Officer (SSO) is responsible for implementing the site health and safety plan. <br /> This includes ensuring that field personnel have read and signed the HSP, and that a Tailgate <br /> Safety Meeting is conducted on site each day prior to initiating field activities. In addition, the <br /> SSO will be responsible for auditing the site operations for compliance with the health and safety <br /> plan and any applicable federal, state or local requirements. The SSO is required to be on site at <br /> all times. In the SSO' s absence, a designated alternate will assume the duties and <br /> responsibilities. <br /> Work Objectives/Scope: Conduct soil and groundwater investigation related to a former <br /> underground storage tank (UST). For this investigation, soil and groundwater grab samples will <br /> be collected from three (3) soil borings using a Geoprobe 5400 Direct Penetration Technology <br /> (DPT) rig. <br /> 1 <br />