Laserfiche WebLink
;i <br /> that are beyond the scope of this plan . Any changes in project work scope and/or site conditions <br /> as described must be amended in writing. <br /> 2.0 SITE DESCRIPTION <br /> The Site consists of a large warehouse building that previously operated as a parking lot and auto <br /> service center. In 1996, two gasoline USTs (8,000 and 1 ,000 gallons) were removed from the <br /> sidewalk in front of the Site (Figure 2) . Product lines trended approximately 304eet from the <br /> USTs to a pump island located in the building. The fuel lines from the USTs to the pump islands <br /> appear to have been removed, but no samples appear to have been collected below the fuel lines. <br /> Subsequent soil and groundwater investigations have identified relatively high concentrations of <br /> gasoline, benzene and other petroleum hydrocarbons in soil and groundwater below the former <br /> UST locations and the pump island. <br /> 3.0 PROJECT ORGANIZTION AND DESCRIPTION OF TASKS <br /> 3.1 Project Organization <br /> The following summarizes the project contacts, client, Treadwell & Rollo project personnel and <br /> subcontractors associated with the project. A description of responsibilities for Treadwell & <br /> Rollo personnel are described in Section 3 .3 . <br /> HEALTH & SAFETY PLAN 2 8 November 3004 <br /> TREADWELL & ROLLO, INC. 3597.11 N SP-3 <br />