My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2900 - Site Mitigation Program
>
PR0505148
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:12:43 PM
Creation date
2/5/2020 2:50:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0505148
PE
2950
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Steel-toed Boots <br /> • Orange Safety Vest (on roadways or construction areas) <br /> Modified Level D (One or more of the following) <br /> • Latex Gloves (when handling samples or sampling equipment) <br /> • Tyvek Coverall <br /> • Hearing protection (muffs and/or plugs). <br /> • Photo Ionization Detector (PID) (tasks requiring air monitoring) <br /> 4.4 Air Monitoring and Site Action Levels <br /> Air monitoring equipment shall include a photo ionization detector (PID) drilling/probing and <br /> sampling activities. PID monitoring will be conducted in the breathing zones to obtain accurate <br /> estimates of exposure. The PID measures total VOCs and does not usually respond to any <br /> particular substance where mixtures may be present. The PID instrument shall be calibrated and <br /> properly maintained per the manufactures guidelines. Personnel responsible for monitoring shall <br /> review the manufacturer's information prior to use of an instrument to familiarize themselves <br /> with proper operation and limitations. The project air monitoring action levels and equipment <br /> are summarized below. <br /> Air Monitoring Action Levels <br /> Instrument Frequency Action Levels Calibration/Gas <br /> At the beginning of Breathing Zone: Calibrate per <br /> Photo Ionization operations and <5 ppm Level D manufacturers <br /> Detector (PID) before sampling >5 ppm Stop work; Evacuate procedures <br /> & Vent <br /> Monitor every 15 Reevaluate level of protection if PID gas = 100 ppm <br /> minutes if reading levels continue to exceed 5 ppm in Methane <br /> elevated. the breathing zone <br /> HEALTH& SAFETYPLANn H November 2W <br /> TREADWELL & ROLLO,. INC, > zs97.11HASP-2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.