My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2900 - Site Mitigation Program
>
PR0505148
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:12:43 PM
Creation date
2/5/2020 2:50:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0505148
PE
2950
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vicky McCartney TreaftoWERdlo <br /> San Joaquin County Environmental Division <br /> 11 January 2005 <br /> Page 2 <br /> On 15 December 2004, Treadwell & Rollo conducted the fourth quarter 2004 groundwater <br /> monitoring. Groundwater samples were analyzed for the same analytes requested by SJCEHD in <br /> recent monitoring. The quarterly monitoring report for the fourth quarter of 2004 is currently <br /> being prepared. <br /> Based on historical sampling results and the planned configuration of the new parking garage, <br /> we anticipate that new monitoring wells will be installed in the sidewalk and in the parking <br /> garage after construction is completed. <br /> PROPOSED WELL DESTRUCTION <br /> ) II <br /> Three wells are in an area with groundwater impacts (MW- 1 , MW-2 and MW-3) and shall be <br /> destroyed by drilling out the casings and pressure grouting the holes. The remaining well, yal 7 <br /> MW-4, is located cross-gradient to the source area, has never had detectable contamination, and <br /> shall be destroyed by pressure grouting the well casing in place. After the new building is l �Jrh <br /> constructed, monitoring wells will be replaced as approved by the SJCEHD. <br /> All soil, groundwater and decontamination water generated during well destruction will be stored <br /> on site pending analytical results. All borings will be destroyed in accordance with California <br /> well destruction guidelines and SJCEHD requirements . The well destruction permit is attached. ysll� <br /> SCHEDULE Ar7 i1 �•Y - ?�' "' <br /> Demolition of the building and above-ground improvements will be completed by 21 January d <br /> 2005 . We would like to destroy the site wells during the week of 24 January 2005 . Please <br /> contact either of the undersigned with questions or comments. <br /> Sincerely, <br /> TREADWELL & ROLLO, INC. <br /> Dustyne Sutherland David G. Dixo G. <br /> Senior Staff Scientist Senior Project Manager <br /> 25971103 .DGD <br /> Attachments : Well Destruction Permit Application <br /> Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> cc : Mr. Jay Coffey - City of Stockton <br /> IIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.