Laserfiche WebLink
I TlreadwelMldlo <br /> M Reporting <br /> f <br /> The results of the drilling, monitoring well installation, soil sampling, and initial groundwater sampling will <br /> be summarized in a report. The results of quarterly groundwater sampling will be summarized in <br /> quarterly data submittal reports. The final quarterly report will provide a summary of results and <br /> (_ recommendations for further action . <br /> 8.5 Investigation-Derived Waste <br /> The activities described in this work plan will generate the following wastes: (1) soil cuttings and excess <br /> i <br /> soil samples, (2) development and purge water, and (3) decontamination wastewater. The soil, <br /> development water, and purge water will be containerized in steel 55-gallon drums and disposed of <br /> appropriately after the laboratory analyses results have been evaluated . <br /> r �) <br /> i 9.0 LIMITATIONS <br /> Activities undertaken as part of this assessment were conducted on behalf of the City of Stockton to <br /> assess the presence of petroleum hydrocarbons in soil and groundwater in the vicinity of the former UST <br /> location . No other party should rely on the information presented in this document without the express <br /> I1 <br /> written permission of Treadwell & Rollo. <br /> 1 <br /> r , <br /> The conclusions presented in this report are professional opinions based on the specific activities <br /> conducted . Treadwell & Rollo, Inc. makes no guarantees or warranties with respect to the accuracy or <br /> completeness of this information. Opinions and recommendations presented herein apply to site <br /> 1 <br /> conditions existing at the time of our assessment, and cannot necessarily be taken to apply to site <br /> changes or conditions of which we are not aware and have not had the opportunity to evaluate. Also, <br /> i <br /> this was a subsurface investigation, and no assessment of hazardous materials in structures such as <br /> asbestos containing building materials, lead paint, or PCB containing electrical equipment was conducted. <br /> i <br /> i <br /> - 1 <br /> 15 <br /> 25971201 . DGD 6 February 2008 <br />