My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003232
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2900 - Site Mitigation Program
>
PR0505148
>
ARCHIVED REPORTS_XR0003232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 6:30:43 PM
Creation date
2/5/2020 2:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003232
RECORD_ID
PR0505148
PE
2950
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br /> INTRODUCTION <br /> PURPOSE <br /> The purpose of this plan is to establish personnel protection standards and mandatory safety <br /> practices and procedures This plan assigns responsibilities, establishes standard operating <br /> procedures,and provides contingencies that may anse during site excavation activities <br /> This site safety plan covers personal health and safety factors for the work involved in drilling or <br /> excavating structural foundations relating to the presence of the quantities of petroleum <br /> hydrocarbons in the soil between 25 and 75 feet in depth and the two water bearing zones located at <br /> approximately 25 and 50 feet below the surface <br /> APPLICABILITY <br /> The provisions of this plan are advisory in nature for all construction tasks As with all <br /> underground construction, actual site conditions are not known Accordingly, this plan allows for <br /> some degree of flexibility and discretion This plan sets the framework for field influenced site <br /> safety decisions <br /> PROJECT TEAM ORGANIZATION <br /> Principal in Charge Gene George, F&H Construction <br /> • Industrial Hygienist Michael Van Brunt, Van Brunt Associates <br /> Principal in Charge <br /> (925) 685-5900 <br /> Onsite Industrial Hygienist Dave Sweet,Van Brunt Associates <br /> (510)455-1513 <br /> COMMUNICATIONS <br /> All verbal communications shall be with the Foreman of F&H Construction, who will evaluate and <br /> take advisory or corrective actions as needed for subcontractors onsite Dave Sweet will act as the <br /> onsite Industrial Hygiene consultant to advise F&H Construction as to the conditions onsite as <br /> measured and observed <br /> All written correspondence shall be to the attention of Gene George,F&H Construction <br /> Health and Safety Plan for F&H Construction <br /> 130 North Hunter St, Stockton, CA <br /> Pana Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.