My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOBS
>
0
>
2900 - Site Mitigation Program
>
PR0518817
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 4:38:00 PM
Creation date
2/5/2020 3:22:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518817
PE
2960
FACILITY_ID
FA0014163
FACILITY_NAME
SANTA FE PIPELINE & KINDER MORGAN
STREET_NUMBER
0
STREET_NAME
JACOBS
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
JACOBS RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Victoria Taylor <br /> Page 2 <br /> August 23,2002 <br /> 5. Rationale for Determining Step-Out Locations. As discussed, the rational for the <br /> location of the temporary piezometers for groundwater chemistry and groundwater <br /> gradient assessment will be as follows: <br /> • Day 1 <br /> - Gradient. Four piezometers will be installed at 200 feet from the center of the <br /> former soil excavation area, to the north,south,east,and west,respectively. <br /> - Chemistry. Six piezometers will be installed at 25 feet from the center of the <br /> former soil excavation area at an even spacing and then sampled. <br /> • Day 2 <br /> - Gradient. The four piezometers will be shot for elevation,and the gradient will <br /> be determined. <br /> - Abandonment. The ten piezometers will be abandoned. <br /> The results will be provided to the RWQCB,including recommendations for additional <br /> work. Additional work will be performed,if necessary,after discussion with the <br /> RWQCB about the results and the scope of that work. <br /> 6. TPG-D Container Volume/Preservative Requirements. The container and preservative <br /> requirements for analysis of total petroleum hydrocarbons as diesel(TPH-d)were <br /> verified with the lab,Alpha Analytical,and are correct. The methodology using this <br /> smaller volume is approved by the State DHS. The preservative is not necessary,and <br /> will not be added. See Table 1 for analytical method,container,preservative,and <br /> holding time requirements. <br /> 7. Signature by Registered Professional. The signature for this addendum will satisfy the <br /> signature requirement by a registered professional for both this addendum and the June <br /> 27,2002 work plan. <br /> Also,a revised project schedule is attached as Figure 1. Note that this is the same schedule <br /> submitted with the June 27,2002 letter,but pushed back to reflect the date of this <br /> addendum. <br /> Please call me at 805-371-7817 ext.23 if you have any questions or comments about the <br /> proposed work described in this letter. <br /> Sincerely, <br /> CH2M HILL <br /> Mark uttig,RG No. 6820 <br />
The URL can be used to link to this page
Your browser does not support the video tag.