Laserfiche WebLink
E <br /> A <br /> {E <br /> €E <br /> copyright 02003 <br /> r <br /> r <br /> ENGINEER - ARCABIS <br /> 2.8 CONSTRUCTION SYMBOLSNGGINEER AND DEFINITIONS EQUIPMENT SYMBOLS c <br /> 1. THE CONTRACTOR SHALL CONFIRM A CONSTRUCTION SCHEDULE WITH CBNTRACTUR - TBI] <br /> THE ENGINEER'S PROJECT MANAGER AT LEAST 14 DAYS PRIOR TO ANY AC ALTERNATING CURRENT -fla— GATE VALVE <br /> WORK AT THE SITE. <br /> S <br /> 2. THE PROPOSED CONSTRUCTION SCHEDULE SHALL BE PRESENTED IN A 0/DIA DIAMETER GLOBE VALVE <br /> TIMELINE FORMAT SHOWING ESTIMATED START DATE,DURATION,AND, DWG DRAWING —�,— NEEDLE VALVE <br /> € COMPLETION TIMES FOR EACH ACTIVITY. ANY DEVIATION FROM THE J <br /> ORIGINALLY PROPOSED SCHEDULE MUST BE COMMUNICATED TO THE O PHASE BALL VALVE <br /> ENGINEER'S PROJECT MANAGER WITHIN 24 HOURS. V VOLTS <br /> � CHECK VALVE <br /> 2,9 AS-BUILT DRAWINGS HDPE HIGH DENSITY POLYETHYLENE <br /> 1. THE CONTRACTOR SHALL PROVIDE AS BUILT RECORD DRAWINGS(RED HASP HEALTH AND SAFETY PLAN SCREWED CAP <br /> LINES)SHOWING ACTUAL DETAILS,DIMENSIONS,AND OTHER PERTINENT —©— REDUCERIINCREASER <br /> FEATURES THAT VARY FROM THE ORIGINAL DESIGN. ID IDENTIFY <br /> 3.0 SAFETY/CLEANUPJMP JOURNEY MANAGEMENT PLAN DIRECTION OF FLOW <br /> JLA JOB LOSS ANALYSIS may— UNION <br /> 1. THE CONTRACTOR(INCLUDING WORKERS AND SUBCONTRACTORS) LPS LOSS PREVENTION SYSTEM <br /> SHALL PREPARE A SITE-SPECIFIC HEALTH AND SAFETY PLAN(HASP)AND PRESSURE RELIEF <br /> A JOURNEY MANAGEMENT PLAN(JMP)PRIOR TO BEGINNING ANY WORK, <br /> g AND SHALL ABIDE BY THE HASP DURING ALL SITE WORK. A COPY OF THE NEC NATIONAL ELECTRICAL CODE <br /> R HASP AND JMP SHALL BE PROVIDED TO THE ENGINEER PRIOR TO 1 DETAIL 1 ON SHEET 2 <br /> BEGINNING ANY SITE WORK AND SHALL REMAIN ONSITE DURING NPT NATIONAL PIPE THREAD 2 <br /> CONSTRUCTION. <br /> 2. PRIOR TO DEPARTURE FROM THE SITE,THE CONTRACTOR SHALL MAKE NTS NOT TO SCALE � ITEM NUMBER FROM SHEET G-2 <br /> SURE THAT THE WORK AREA IS CLEAN AND ORDERLY.THE CONTRACTOR PSI POUNDS PER SQUARE INCH <br /> SHALL CONTAIN LOOSE DEBRIS AND STORE CONSTRUCTION MATERIALS <br /> ON A DAILY BASIS PRIOR TO DEPARTURE FROM THE SITZ~TO PROVIDE A SCFM STANDARD CUBIC FEET PER MINUTE SOLENOID <br /> CLEAN AND ORDERLY WORK AREA. <br /> 3. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL,STATE,LOCAL,FUEL SPEC SPECIFICATION <br /> TERMINAL,AND CHEVRON-SPECIFIED HFALTH AND SAFETY <br /> REQUIREMENTS, SSE SHORT SERVICE=EMPLOYEE <br /> 4. CONTRACTOR SHALL STORE AND SECURE;ANY LOOSE TOOLS,SUPPLIES, TBD TO BE DETERMINED <br /> OR EQUIPMENT CONTAINED IN VEHICLE PRIOR TO LEAVING THE SITE, <br /> 5. CONTRACTOR SHALT.ABIDE BY ENGINEER AND CHEVRON APPROVED JOB TYP TYPICAL <br /> JLA. <br /> 6. EXCLUSION ZONE SHALL 8E CLEARLY SECTIONED OFF USING,BUT NOT M. rSM WE OEOSPIf011 <br /> RESTRICTED TO,DELINEATORS,CAUTION TAPE,AND CONSTRUCTION <br /> FENCING, <br /> F 7. ALL EMPLOYEES OF THE CONTRACTOR SHALL BE CURRENT WITH THEIR <br /> 40-HOUR HAZWOPER TRAINING AND B-HOUR REFRESHER. ALL <br /> EMPLOYEES OF THE CONTRACTOR SHALL BE TRAINED 1N CHEVRON'S LPS, <br /> PROOF OF SAID DOCUMENTS SHALL_BE KEPT ONS€TE. CONTRACTOR <br /> SHALL MEET REQUIREMENTS OF CHEVRON'S SSE PROCESS, <br /> 8. CONTRACTOR SHALL MARK ALL POTENTIAL OVERHEAD AND/OR TRIP PROJECT TINE <br /> HAZARDS IN YELLOW. <br /> 4.0 INSPECTIONS <br /> 1. CONTRACTOR MUST PROVIDE ENGINEER MINIMUM OF 24 HOURS NOTICE <br /> PRIOR TO ANY SITE INSPECTIONS WITH LOCAL GOVERNMENT. ALL FIRE BIOSPARGE TREATMENT SYSTEM <br /> i DEPARTMENT INSPECTIONS ARE TO BE REQUESTED BY CONTRACTOR, BANTA BULK FUEL TERMINAL <br /> PLEASE BE SPECIFIC AS TO TYPE OF INSPECTION, BANTA BULK <br /> F ROAD <br /> BANTA, CALIFORNIA <br /> CONSTRUCTION NOTES <br /> R 1 <br /> No,046643 <br /> xp, <br /> PROJECT WWAG£R DEPARTMENT LIMIAGER <br /> D.EHANS J.VOGELEY <br /> L / Cl M LM DESIGN PROF. CliECKED BY <br /> P. HAJALI CHECKED <br /> E ® L 1 ` TASK/PHASE NUMBER DRAWN BY <br /> y z ODOD2/0000 B.J.WALL <br /> u PROJECT HLIMBER DRAWING NUMBER <br /> 80046293.0000 G-I B <br /> E <br /> F <br />