My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
4505
>
2900 - Site Mitigation Program
>
PR0523363
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:24:31 PM
Creation date
2/5/2020 4:31:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523363
PE
2965
FACILITY_ID
FA0015787
FACILITY_NAME
SIERRA HILLS PACKING
STREET_NUMBER
4505
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08917052
CURRENT_STATUS
01
SITE_LOCATION
4505 4799 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 1,2004 <br /> NOA Project Number: LE03-034 <br /> Pae 10 <br /> Test Parameter I DLR Unit Method <br /> Iron 150 / EPA 200.7 <br /> Manganese 120 1 ug/4EPA 200.7 <br /> Conventional Chemistry Parameters by APHA/EPA Methods <br /> Ammonia as N 10.2 m / EPA 350.3 <br /> Total Kjeldahl Nitrogen 10.200 mg/ EPA 351.2 <br /> DBCP by EPA Method 504.1 <br /> 1,2-Dibromo-3-chloro ropane 10.0200 1 g/rEPA 504.2 <br /> Ttihalomethanes by EPA Method 524.2 <br /> Bromodichloxomethane 1.00 1 Ug/4Ug/4 EPA 524.2 <br /> Bxomofosm - 1.00 ug/11 ug/11EPA 524.2 <br /> Chloroform 1.00 u / EPA 524.2 <br /> Dibromochlozomethane 0.500 u / EPA 524.2 <br /> 'ToYa]Trihalomethaae HNP 3.50 u / EPA 524.2 <br /> 7.0 WATER LEVEL MEASUREMENTS <br /> We recommend that the following procedures and tolerances be used to measure the depth to the <br /> ground water table in all four (4) proposed monitoring wells. The procedure is as follows: <br /> Vent-wells to the atmosphere for a minimum of 10 minutes. Prior to measurement, the well sounder <br /> will be decontaminated. Also check the sounder for good working order and condition. Identify .the <br /> reference mark on the top of well casing. Lower the sounder probe into well and note.the distance . <br /> between the audible sound (loud "beep") and the reference mark on the top of casing. Verify this <br /> distance a minimum of three times by lifting and dropping the wire line until the distance is <br /> consistent. Record this distance to an accuracy of 0.01 feet by reading the scale on the wire line. <br /> Also.note the well location, time, and date along with the depth to ground water. <br /> 8.0 PROPOSED TIME SCHEDULE FOR WORK <br /> We propose beginning work on or about the October. 15, 2004 and completing no later than 30`s of <br /> November-2004. We anticipatea.Well Constn:cdon and M.anitonng Report will be completed on.ot <br /> about the 15' of January,2005. <br /> 1 <br /> 1 <br /> 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.