Laserfiche WebLink
! October 1, 2004 <br /> ! NOA Project Number: LE03-034 <br /> 9.0 WELL CONSTRUCTION AND MONITORING REPORT <br /> A report will be prepared to present the well construction details and analytical test <br /> results for the four (4) monitoring wells. The report will describe the drilling ✓ <br /> activities, soil conditions encountered, first encountered ground water, <br /> estimated ground-water gradient computed from the four monitoring wells, and both field and <br /> laboratory test results. The report will also include the:well soil logs, construction diagrams, and <br /> laboratory test result sheets. <br /> 10.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This Ground Water Quality Investigation Workplan has been prepared under the supervision and <br /> direction of the undersigned. <br /> yee.aA44 <br /> WAq y� <br /> � vp <br /> w No.000797 a° <br /> �* Expires: �r3oo5k <br /> P <br /> ��'►jyrCnL0 <br /> Cliffox alker,Jr. <br /> R.E.A. 1-00797 <br /> Project Manager <br /> qF0 <br /> G� <br /> rr OP No. 2151 S � <br /> • CERTIFIED <br /> ENGINEERING • <br /> David J.Welch, M.Sc. N�A GEOLOGIST y <br /> CEG-2151, CHG-653, GP-1049 �OFCAUFOe <br /> Environmental Department Manager <br /> 11 <br /> 1 <br />