My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:23:01 AM
Creation date
2/6/2020 8:34:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524672
PE
2965
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Carollo Engineers _ Man <br /> November 21, 2006(Project No. 3045.036) <br /> CONTENTS <br /> Page <br /> 1.0 GENERAL SITE INFORMATION.........................................................................................1 <br /> 1.1 Site Location and Monitoring Well Locations ..............................................................1 <br /> 1.2 Monitoring Well Construction Details ..........................................................................1 <br /> 1.3 Equipment Decontamination Procedures....................................................................2 <br /> 1.4 Health and Safety Plan................................................................................................2 <br /> 1.5 Topographic Map ........................................................................................................2 <br /> 2.0 WATER LEVEL MEASUREMENT.......................................................................................3 <br /> 2.1 Surface Elevations ......................................................................................................3 <br /> 2.2 Well Construction........................................................................................................3 <br /> 2.3 Well Development, Water Handling, and Water Level Measurement.........................3 <br /> 3.0 WELL SAMPLING................................................................................................................4 <br /> 4.0 PROPOSED SCHEDULE ....................................................................................................5 <br /> PLATES <br /> Plate <br /> SiteLocation Map.........................................................................................................................1 <br /> SitePlan........................................................................................................................................2 <br /> Well Construction Details..............................................................................................................3 <br /> APPENDIX <br /> APPENDIX A PRELIMINARY HEALTH AND SAFETY PLAN <br /> G WBDOCS3U5 5.O3 INP 0005 K-21NOMWC I <br />
The URL can be used to link to this page
Your browser does not support the video tag.