My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
1525
>
2900 - Site Mitigation Program
>
PR0526000
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:13:37 PM
Creation date
2/6/2020 8:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526000
PE
2965
FACILITY_ID
FA0017598
FACILITY_NAME
LANGE TWINS WINE ESTATE
STREET_NUMBER
1525
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00315008
CURRENT_STATUS
01
SITE_LOCATION
1525 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCTOBER 17,2005 <br /> NOA PROJECT NUMBER E05131A <br /> Every fourth Quarterly Report shall be expanded into an Annual Report. The annual report shall <br /> include the Quarterly Report for the most recent groundwater sampling event,plus a comprehensive <br /> evaluation of the wastewater generation and application operations. The Annual Report will include, <br /> but not be limited to,an expanded groundwater sampling list (see Table 1). <br /> After a total of four quarters of groundwater sampling (a minimum of 12 independent groundwater <br /> samples is required),a statistical comparison of up-gradient and down-gradient groundwater quality will <br /> be conducted as part of the "Background Groundwater Quality Study Report". The statistical <br /> comparison will employ one of the methods identified in Tide 27, §20415(e)(10) or equivalent. <br /> All reports of groundwater quality will be prepared under the direct supervision of a Professional <br /> Geologist or Registered Engineer. <br /> 4.0 PROPOSED TIME SCHEDULE <br /> October 17, 2005—Submittal of this Workplan <br /> January 14, 2006—Installation of the approved groundwater monitoring wells (MW-1 to MW-3). <br /> April 30, 2006—Submit Groundwater Well Installation Report of Results andQMR FirstQuarter 2006. <br /> July 30,2006 - Submit QMR Second Quarter 2006. <br /> October 30,2006 -Submit QMR Third Quarter 2006. <br /> January 30, 2007 - Submit QMR Fourth Quarter 2006. <br /> March 30, 2007—Submit Background GroundwaterQuality Study Report. <br /> The first monitoring well sampling event will be scheduled for 3 to 4 weeks after well development is <br /> complete,and would include the annual parameter list(see Table 1).Based on this schedule,the earliest <br /> the first sampling could be conducted would be the first quarter of 2006,and the Background Groundwater <br /> Quality Study Report could be submitted as soon as the end of the first quarter of 2007. <br /> 7 "004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.