OCTOBER 17,2005 <br /> NOA PROJECT NUMBER E05131A <br /> Every fourth Quarterly Report shall be expanded into an Annual Report. The annual report shall <br /> include the Quarterly Report for the most recent groundwater sampling event,plus a comprehensive <br /> evaluation of the wastewater generation and application operations. The Annual Report will include, <br /> but not be limited to,an expanded groundwater sampling list (see Table 1). <br /> After a total of four quarters of groundwater sampling (a minimum of 12 independent groundwater <br /> samples is required),a statistical comparison of up-gradient and down-gradient groundwater quality will <br /> be conducted as part of the "Background Groundwater Quality Study Report". The statistical <br /> comparison will employ one of the methods identified in Tide 27, §20415(e)(10) or equivalent. <br /> All reports of groundwater quality will be prepared under the direct supervision of a Professional <br /> Geologist or Registered Engineer. <br /> 4.0 PROPOSED TIME SCHEDULE <br /> October 17, 2005—Submittal of this Workplan <br /> January 14, 2006—Installation of the approved groundwater monitoring wells (MW-1 to MW-3). <br /> April 30, 2006—Submit Groundwater Well Installation Report of Results andQMR FirstQuarter 2006. <br /> July 30,2006 - Submit QMR Second Quarter 2006. <br /> October 30,2006 -Submit QMR Third Quarter 2006. <br /> January 30, 2007 - Submit QMR Fourth Quarter 2006. <br /> March 30, 2007—Submit Background GroundwaterQuality Study Report. <br /> The first monitoring well sampling event will be scheduled for 3 to 4 weeks after well development is <br /> complete,and would include the annual parameter list(see Table 1).Based on this schedule,the earliest <br /> the first sampling could be conducted would be the first quarter of 2006,and the Background Groundwater <br /> Quality Study Report could be submitted as soon as the end of the first quarter of 2007. <br /> 7 "004 <br />