My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Art Gomez <br /> August 14,2018 <br /> Page 2 _7 <br /> g .::off ,Kr i;; "1V E <br /> Recap: AUG G 0 2018 <br /> • No Confined space entry. ENVIRONMENTAL HEALTH <br /> Determine the approximate location of the modification. <br /> • All approved UL materials will be used D1813 Resin DEPARTMENT <br /> • Take deflection readings <br /> • Conduct a 3 psig pressure test to insure collar integrity has been maintained. <br /> • All work to be done by a Xerxes technician <br /> The modification area will be using an air driven, hand held diamond cutting saw. The area <br /> around the removed section will be sanded using an air driven, hand held grinder to ensure the <br /> new laminate adheres to the original laminate. A new laminate will be constructed in place <br /> where the collar laminate was removed using fiberglass mat and woven roving that has been <br /> wet out with corrosion resistant resin. The resin encapsulated fiberglass mat and woven roving <br /> will be placed over the new collar that have has been replaced, then rolled out using standard <br /> hand held aluminum rollers. In accordance with Xerxes safety procedures, all tools used in the <br /> repair of the fiberglass laminate will be air driven tools containing no spark producing motors. All <br /> lights inside the tank will be explosion-proof and safety certified. <br /> Note: Xerxes' Warranty on these tanks will not start anew; however, it will continue for the <br /> duration as stated in the original Warranty based upon the date of original purchase. In <br /> addition, there will be a one-year warranty on materials and workmanship for the repairs <br /> done on these tanks. This Warranty will be in effect as long as the tanks are (or were) <br /> installed in accordance with Xerxes' written specifications and published installation <br /> instructions. Always consult state and local codes when installing underground storage <br /> tanks. <br /> Please call me if you have any questions. <br /> Sincerely, <br /> Danny Garcia, CCT <br /> Field Service Coordinator <br /> c: Jim Anderson <br /> Jose Mesa <br />
The URL can be used to link to this page
Your browser does not support the video tag.