My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2900 - Site Mitigation Program
>
PR0528324
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:49:33 PM
Creation date
2/6/2020 9:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528324
PE
2965
FACILITY_ID
FA0019131
FACILITY_NAME
SUTTER HOME LODI WINERY
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01109014
CURRENT_STATUS
01
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..i <br /> Kennedy/Jenks Consukants <br /> - Specific conductance <br /> - Dissolved oxygen <br /> - Oxidation-reduction potential (ORP) <br /> - Other observations as appropriate (turbidity, color, presence of odors, sheen, etc). <br /> (4) Continue purging until water quality parameters have stabilized (refer to "Stabilization <br /> Criteria for Adequacy of Monitoring Well Purging" below) and/or a minimum of three <br /> wetted-casing volumes of water have been removed from the well. If a well purges dry, <br /> let it recover to 80 percent of original water column, then sample. If the well takes a very <br /> long time to recover(i.e., longer than 2 hours), try to sample the well at the end of day <br /> or first thing the next day. <br /> (5) Collect the sample in pre-cleaned sample containers suitable for the laboratory <br /> analyses to be performed. <br /> (6) If sampling using a bailer, use a bottom-emptying device or other technique to avoid <br /> sample agitation. If the collected water is very turbid, or a bottom-emptying bailer is not <br /> used, properly transfer the water from the bailer into the appropriate sample containers. <br /> Be careful to avoid agitating the sample. When sampling for VOCs, turn the bottle <br /> upside down after filling the container to identify possible headspace. If bubbles are <br /> present, top off the sample container or resample. <br /> 3. Field Filtering Groundwater Samples. Groundwater sample filtering and/or preservation <br /> should be performed in accordance with the requirements of the analytical method being <br /> specified and any other project-specific requirements. For example, samples collected for <br /> dissolved metals are typically filtered using a 0.45 pm filter. <br /> 4. Sample Collection Considerations. When multiple analyses will be performed, collect the <br /> samples in order of decreasing sensitivity to volatilization (i.e., VOC samples first and metals <br /> last). When sampling for VOCs, turn the sample container upside down after filling to identify <br /> possible headspace. If bubbles are present, top off the sample bottle or resample (do not reuse <br /> bottles, especially if they have been pre-preserved by the vendor or laboratory). If possible, the <br /> pump should not be moved or turned off between purging and sampling; however, the pump <br /> may need to be turned off for a very brief period (as a practical matter) so field personnel can <br /> handle samples and minimize the potential for water to splash on the ground surface. The <br /> ground surface should be protected from incidental splashing, especially if water from the well <br /> would be considered a hazardous waste for disposal purposes. <br /> 5. Monitoring Wells with Slow Recharge. If a well purges dry, let it recover to 80 percent of <br /> original water column, then sample. If the well takes a very long time to recover(i.e., longer than <br /> 2 hours), try to sample the well at the end of day or first thing the next day. <br /> 6. Sample Container Filling and Shipping. Fill the appropriate containers for the analyses to be <br /> requested and ensure that the required label information is completely and accurately filled in. <br /> Follow sampling packaging, shipping, and chain-of-custody procedures (see applicable SOG). <br /> 7. Decontamination. Follow personnel and equipment decontamination procedures(see <br /> applicable SOG). <br /> Monitoring Well Replacement Work Plan, SOG 4 <br /> Sutter Home Lodi Winery, Lodi, California Page 4 of 7 <br /> glkltryyovpbdmin�'robW810865005.15 siMMwn,e109vepnrtsMWlnHdl wplappb_syN pwsmnp revJrm.Ea <br />
The URL can be used to link to this page
Your browser does not support the video tag.