My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2900 - Site Mitigation Program
>
PR0528324
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:49:33 PM
Creation date
2/6/2020 9:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528324
PE
2965
FACILITY_ID
FA0019131
FACILITY_NAME
SUTTER HOME LODI WINERY
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01109014
CURRENT_STATUS
01
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consukenb <br /> Section 1: Introduction <br /> This Monitoring Well Replacement Work Plan, Sutter Home Lodi Winery(Work Plan) is <br /> submitted by Kennedy/Jenks Consultants(Kennedy/Jenks) on behalf of the Sutter Home Lodi <br /> Winery (Sutter Home) located at 18667 Jacob Brack Road in Lodi, California (the site). <br /> 1.1 Background <br /> Sutter Home operates a wine production facility at the site. Process wastewater produced from <br /> winery operations is managed in accordance with the Waste Discharge Requirements Order <br /> No. R5-2009-0073 as modified by Order No. R5-2012-0078(collectively, the Order) issued to <br /> Sutter Home by the California Regional Water Quality Control Board, Central Valley Region <br /> (Water Board). <br /> Sutter Home is in the process of expanding its wine production operations at the site. Facility <br /> expansion will result in an increased production of process wastewater requiring treatment prior <br /> to land application to agricultural fields. Moreover, the facility expansion will necessitate both <br /> redesign and reconfiguration of several portions of the existing land application areas (LAAs), as <br /> well as creation of new LAAs from existing agricultural fields. A Report of Waste Discharge was <br /> submitted to the Water Board in May 2014 (Kennedy/Jenks 2014), and revised Waste <br /> Discharge Requirements are being developed, with adoption scheduled for June 2015. Sutter <br /> Home has purchased property immediately west of the existing facility,which will be used for <br /> land application of process wastewater once the updated WDRs are issued and after these <br /> fields are reconfigured for land application of process wastewater. <br /> 1.2 Objective <br /> Sutter Home is currently adding facilities at the Site, and expects to further expand its <br /> production activities in 2015. Two monitoring wells and a piezometer are located in part of the <br /> existing 15.5-acre LAA that is scheduled for reconfiguration. Specifically, this LAA will be <br /> converted from a grass plot irrigated with a sprinkler system to a cropped field irrigated via <br /> surface flow. There are two groundwater monitoring wells and one former piezometer located <br /> within the LAA that need to be relocated to allow future cropping activities including plowing, <br /> seeding and harvesting. This Work Plan describes the proposed removal and replacement of <br /> the monitoring wells. <br /> Monitoring Well Replacement Work Plan Page 1 <br /> Sutter Home Winery, Lodi, California <br /> g YsgrouoWM*bll18`AB65 5.15_¢ homeOPep� install VglXtdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.