Laserfiche WebLink
• <br /> 3) Follow the guidelines of the EPA Guidelines on Class V Shallow Disposal Wells attachment to close a Class V well <br /> (Case C), but send the reports, etc,to EHD not EPA. <br /> 4) This will be Phase II investigation project initially to see if there is any contamination of the soil and/or ground <br /> water from this injection well.We will require$375 Site Mitigation Work plan fee, Master file record form <br /> completed,the work plan that follows the EPA guidance to sample the bottom and side walls of the <br /> boring/ground water,and the well destroyed by removing all contents of the well by over drilling.A third party <br /> shall collect the samples and deliver to the lab for analysis and the lab shall be instructed to release the results <br /> directly to EHD to my attention. Collect and containerize all cuttings of the over drilled well until we have the <br /> results from the lab. <br /> 5) If the results do not show any indication of contamination,then we will close this case once the containerized <br /> cuttings are properly disposed of and we verify the waste water is being properly disposed of. <br /> 6) If contaminants are found then we complete a prop 65 and notify Regional Water Quality Control Board and <br /> DTSC,and will require the cleanup of the site under our oversight, if Regional Board or DTSC decline this case. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> Adrienne <br /> Adrienne Ellsaesser, REHS <br /> Program Coordinator <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton ,CA 95205 <br /> Ph (209)468-0343 <br /> Fax (209)468-0341 <br /> aellsciesser@socehd.com <br /> From: Heather Shaddox fmailto:heather.shaddox(alnoanderson.com] <br /> Sent: Thursday, March 06, 2014 11:34 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: Steven Shih [EH] <br /> Subject: Neil 0. Anderson &Associates, Waste Water Disposal System <br /> Adrienne Ellsaesser, <br /> I'm Heather Shaddox with Neil O.Anderson &Associates and will be developing a Work Plan with our Environmental <br /> Division Manger, Daniel Kramer,for sampling our current dry wells and installing an appropriate waste water disposal <br /> system. I have a few preliminary questions about the process and Work Plan: <br /> • Is it correct that a Work Plan is required?Will we receive documentation stating what is required? <br /> • Should the Work Plan address sampling the current dry well and installing an appropriate disposal system? <br /> Should it address anything else? <br /> 3 <br />