My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:36:45 PM
Creation date
2/6/2020 9:52:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540782
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
715 N HUNTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> f �r, <br /> TABLE OF CONTENTS <br /> Page <br /> J1.0. INTRODUCTION............................................................ 1 <br /> T 2.0. BACKGROUND ............................................................. 1 <br /> 2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING.................. 1 <br /> E 2.2. UNDERGROUND STORAGE TANK REMOVAL ........................ 2 <br /> 2.3. PRELIMINARY SITE ASSESSMENT ..................................... 3 <br /> (j 2.4. GROUND WATER DEPTH AND FLOW DIRECTION.................... 4 <br /> 3.0. SCOPE OF WORK .......................................................... 4 <br /> 3.1. PERMITTING AND PRE-FILED WORK PREPARATIONS .................... 4 <br /> 3.2. DRILLING AND SOIL SAMPLING ....................................... 4 <br /> 3.3. MONITORING WELL INSTALLATION,DEVELOPMENT AND SURVEY ...... 6 <br /> '.� 3.4. GROUND WATER SAMPLE COLLECTION AND ANALYSIS ................ 6 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS 6 <br /> 4.0. FIELD PROCEDURES ....................................................... 7 <br /> ' 4.1 SOIL SAMPLING ...................................................... <br /> 4.2. MONITORING WELL INSTALLATION ................................... 7 <br /> 4.3. WELL DEVELOPMENT AND SURVEY ................................... 8 <br /> 4.4. GROUND WATER SAMPLING PROCEDURES ............................. 8 <br /> 4.4.1. Static Water Level Measurements ................................... 8 <br /> 4.4.2. Well Evacuation ................................................. <br /> (JJ 4.4.3. Sample Withdrawal .............................................. 9 <br /> 4.4.4. Sample Handling................................................. 9 <br /> 1 4.5. EQUIPMENT DECONTAMINATION ..................................... 9 <br /> J 4.6. BORING ABANDONMENT ............................................. 9 <br /> FIGURES <br /> Figure 1-Location Map <br /> Figure 2-Site Plan <br /> k Figure 3-Geologic Cross Section A-A' <br /> Figure 4-Monitoring Well Design <br /> TABLES <br /> Table 1-Analytical Results of Soil Samples Underground Storage Tank Removal <br /> J Table 2-Analytical Results of Soil Samples <br /> Table 3-Analytical Results of Ground Water Samples <br /> APPENDICES <br /> I <br /> Appendix A-EHD Directive Letter <br /> i <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.