My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:15:34 PM
Creation date
2/6/2020 10:10:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' (YVATC <br /> f <br /> An electrical subcontractor will be installing electrical conduit from the on-site pad-mounted <br /> transformer to the area where the proposed remediation compound will be located. This will <br /> provide an individual electric meter for the remediation equipment at the site so costs for electrical <br /> use when operating the remediation system can be reimbursed from the State Cleanup Fund. The <br /> electrical subcontractor has not yet been scheduled. In addition, a fencing subcontractor will be <br /> constructing a 15 foot by 20 foot fenced compound on the south side of the building to house the <br /> remediation equipment. The fencing subcontractor has not yet been scheduled. ATC will notify <br /> you when these subcontractors have been scheduled. <br /> A site map showing the location of the trench areas and remediation compound is attached. ATC <br /> apologizes for interrupting the operations of your tenant, but this work is necessary to complete <br /> the installation of the remediation system at the site. If you require any additional information, or <br /> have any questions concerning scheduled site activities, please contact our office at (209) 579- <br /> 2221 . <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> John Sellman <br /> Staff Geologist/ <br /> Drew Van Allen <br /> Project Manager <br /> cc: Mr. Jeff Wong, San Joaquin County Environmental Health Division <br /> j <br /> i <br /> i <br /> i <br /> w:\wordpro\62596Vettm\fa ffietter 2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.