Laserfiche WebLink
' (YVATC <br /> f <br /> An electrical subcontractor will be installing electrical conduit from the on-site pad-mounted <br /> transformer to the area where the proposed remediation compound will be located. This will <br /> provide an individual electric meter for the remediation equipment at the site so costs for electrical <br /> use when operating the remediation system can be reimbursed from the State Cleanup Fund. The <br /> electrical subcontractor has not yet been scheduled. In addition, a fencing subcontractor will be <br /> constructing a 15 foot by 20 foot fenced compound on the south side of the building to house the <br /> remediation equipment. The fencing subcontractor has not yet been scheduled. ATC will notify <br /> you when these subcontractors have been scheduled. <br /> A site map showing the location of the trench areas and remediation compound is attached. ATC <br /> apologizes for interrupting the operations of your tenant, but this work is necessary to complete <br /> the installation of the remediation system at the site. If you require any additional information, or <br /> have any questions concerning scheduled site activities, please contact our office at (209) 579- <br /> 2221 . <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> John Sellman <br /> Staff Geologist/ <br /> Drew Van Allen <br /> Project Manager <br /> cc: Mr. Jeff Wong, San Joaquin County Environmental Health Division <br /> j <br /> i <br /> i <br /> i <br /> w:\wordpro\62596Vettm\fa ffietter 2 <br /> i <br />