My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003198
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:38:00 PM
Creation date
2/6/2020 10:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003198
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> ' inspector Name mez•Rme& 'v r-/'1)5 Date of Inspection Z <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street Stockton CA Project Manager Jeanne Homsey <br /> Morntonng Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 <br /> VVV2 <br /> V W3 <br /> V W4 <br /> MW1 <br /> Influent before dilution <br /> ' Influent after dilution <br /> Effluent NA NA <br /> ' System Status up/down d oU''" Dilution valve <br /> T O Cumulative Run Time ;3?'8 .6 o Propane% <br /> T O High/Low Temperature at Arrival 0 �� '> >yY8 Piping System <br /> T O Vacuum at Arrival (5" H3 -? -)o`� � Pipe Size I D 2" <br /> ' Notes including any adjustments made to the VES system <br /> �_ -- <br /> Monitoring Point Pressure(psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 <br /> ' AS2 <br /> Influent NA <br /> System Status upldown Pipe Size I D 2" <br /> Piping System Particulate filters <br /> Notes including any adjustments made to the AS system <br /> 77-77—. ' <br /> Groundwater'€;reatmentCnmpoitent, <br /> Monitoring Point I Pressure (psi) Total flow Groundwater Sample Collected <br /> ' Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NA <br /> ' Total Groundwater Discharged LEL Meter Reading <br /> Inspect piping system Particulate filters <br /> ' Notes including any adjustments made to the groundwater treatment system <br /> I <br /> ' 62596/tablestremsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.