Laserfiche WebLink
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> ' Inspector Name �a 40A C �riS�Wa0 /Juin Srn'J"'Date of inspection J 0 0 -7 0-5 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton CA Project Manager Jeanne Homsey <br /> _._VES Component <br /> Monitonng Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled , <br /> VW1 15' fcs xf 13 70 30" j o <br /> vw2 I — S 7*s %r o t O W7 <br /> VW3 -- A)O <br /> ' VW4 ' — X1 0 <br /> MW1 la 31 �S O 3Q„ 3 7 <br /> Influent before dilution 1 - X5-50�... es tvTo 7 K)2 <br /> Influent atter dilution 17, 5 v <br /> Effluent NA NA d& 3 1 re s 5o7Y78 �d <br /> System Status up/down Dilution valve r lest J <br /> ' <br /> TO Cumulative Run Time 319-1.1 Propane% 3V/11 <br /> °l° <br /> T O High/Low Temperature at Arrival '/11 Sy7f 1786 a if-4' Piping System hoc J <br /> TO Vacuum at Arnval j5"`'I-1 Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> rU f tVA M 3% tl—'l <br /> Monitoring Point Pressure(psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 cJ p <br /> AS2 1 <br /> Influent . i? NA <br /> System Status upldown V P Pipe Size I D 2" <br /> Piping System 5 C30) Particulate filters <br /> Notes including any adjustments made to the AS system <br /> ------___IComp en <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> ' Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharged 0 X 1995,3 7 LEL Meter Reading 1",/,5 <br /> Inspect piping system 5 Dad Particulate filters <br /> ' Notes including any adjustments made to the groundwater treatment system <br /> ' 62596/tables/remsysmspection <br />