My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003210
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:02:40 PM
Creation date
2/6/2020 11:00:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003210
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name ht e k f/o fes Date of Inspection 043003 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street,Stockton, CA Project Manager Drew Van Allen <br /> VES Component <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 <br /> V W2 <br /> VW3 <br /> VW4 <br /> Influent before dilution <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status upl own Dilution valve <br /> T O Cumulative Run Time Z.y o Propane% S <br /> T O High/Low Temperature at Arrival Piping System <br /> TO Vacuum at Arrival Pipe Size I D 2° <br /> Notes including any adjustments made to the VES system <br /> �v` a�- o� D8�'O H30o3 � /ranS viii � GjGfL <br /> f�Y1' alt Ca r � <br /> AS Component <br /> Monitoring Point Pressure (psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 <br /> AS2 <br /> Influent NA <br /> System Status up/down il Pipe Size I D 2' <br /> Piping System 01�— Particulate filters <br /> Notes including an adjustments made to the AS system <br /> Fwd aA c <br /> Groundwater Trea—unit t Component <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharggd o6g33�1( • 3 LEL Meter Reading 0• y 4.1Inspect piping system © `L Particulate filters Q �— <br /> • Notes including any adjustmentsade to the groundwater treatment system <br /> 62596/tabies/remsysin spectto n <br />
The URL can be used to link to this page
Your browser does not support the video tag.