My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003210
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:02:40 PM
Creation date
2/6/2020 11:00:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003210
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name C*st,,� 1<1o4 Date of Inspection <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> 3 <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 3,0 NIA 8190 <br /> VVv2 0 <br /> VW3 / 71 ifAAfAn5UJZ <br /> VW4 61;ZR <br /> Influent before dilution �, Cs <br /> Influent after dilution <br /> Effluent I NA NA .. UI <br /> , Zuu+5r6 327 <br /> System Status up/down Dilution valve <br /> T O Cumulative Run Time Z4 76,/6 Propane% 60'Xe <br /> T O High/Low Temperature at Arrival t4 5-7/1547 Piping System Or- <br /> TO Vacuum at Arrival ]6 d Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> 41—b S C-1] V 0 dL- it W 4) 1—zaLLL--`tt P-ALJ eZ5 P SQA 16:36 <br /> 01 <br /> • AS Cqm onont <br /> Monitoring Point I Pressure(psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS 1 '0 L m 4116 <br /> AS2 <br /> Influent 3 , /9 75 4tr NA <br /> System Status upldown Up Pipe Size I D 2" <br /> Piping System 0 V- Particulate filters <br /> Notes including any adjustments made to the AS system <br /> G uri ; p*7 roatF1<iih Ko portent <br /> Monitoring Point Pressure (psi) Total flow Groundwater Sample Collected <br /> Influent NA NA <br /> Post►vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharged 43 3 9. 5 LEL Meter Reading —O O,65 <br /> Inspect piping system 014 D!Z i o e 4,'rs5 f pj,oA/ Particulate filters <br /> Notes including any adjustments made to the groundwater treatment system <br /> 62596/tables/remsysmspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.