My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1134
>
1600 - Food Program
>
PR0162638
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2020 8:28:34 AM
Creation date
2/6/2020 11:20:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0162638
PE
1623
FACILITY_ID
FA0000808
FACILITY_NAME
FROLO
STREET_NUMBER
1134
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1134 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX E <br />HOT WATER DEMANDS <br />FIXTURES <br />NO. OF <br />UNITS <br />X <br />GPH <br />= <br />TOTAL GPH <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />X <br />= <br />I. Calculating the BTU (British Thermal Units) for kitchen gas water heater: <br />GHP x 60 degrees rise x 11 * = BTU <br />*8.33 lbs./gal. of water = 11.1 (rounded off = 11) <br />0.75 (thermal efficiency of gas) <br />The gas hot water heater with at least a rating of BTU <br />II. Calculating the KW (kilowatt) requirement for kitchen electric water heater: <br />Total GPH = GPH = KW* <br />gal/KWH gal/KWH <br />*KW= GPH x °RISE x 8.33 <br />.98 x 3412 BTU <br />Please make the necessary changes or alterations, as indicated above, for the minimum supply of hot water for the food <br />establishment. The recovery rate of the properly sized water heater must meet the peak demands of the total GPH. <br />EHD 16-01 22 PLAN CHECK GUIDE <br />7/5/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.