Laserfiche WebLink
Project No. 014-94276 <br /> Page No. 5 <br /> i <br /> the field portion of the investigation would take approximately one working day, depending on the conditions <br /> encountered. The final report should be available for review approximately ten working days following <br /> destruction of the monitoring wells. <br /> This time schedule is intended for use only as a planning tool. Factors such as the time necessary for <br /> regulatory approval, weather, or the subsurface conditions encountered are beyond our control. <br /> If you have any questions or if we can be of further assistance, please do not hesitate to contact our <br /> Environmental Division Office at(209) 348-2200. <br /> Respectfully submitted, <br /> AZAN &ASSOCIATES, INC. <br /> OQRQFESSIpN ' <br /> FLEXq�p���y� <br /> c� O �' r�1 G eg Issinghoff <br /> Pr ect Geologist <br /> � No.fl02051 .1 g <br /> J Expires Sep 30. 1995 <br /> E <br /> OFC <br /> Dean Alexander <br /> Geotechnical Engineer <br /> R E#002051/RCE#34274 <br /> GI/DAlcmc <br /> 2c herewith <br /> Ic San Joaquin County Department of Health Services <br /> (herewith for distribution) <br /> �4 <br /> f <br /> �I <br /> KRAZAN&ASSOCIATES, INC. <br /> Offices Serving the Western Uniied Slates <br /> 9crrs.Hc <br />