Laserfiche WebLink
05/10/99 MON 12:11 FAX 918 384 1889 SECOR--SACRAMEb[Tu uVV <br /> ARCD Prod""CQMMW 3 <br /> AROO Eadon#04,301 W.Keukmmt Lout.Lodi CA Men&16,1999 <br /> Reporting and Schedule <br /> SECOR anticipates initiating field activities during Mock 1999. After completion of the <br /> field work and laboratory analyses,the data, ill be evaluated and assembled into a <br /> report. Included in the report will be soil analytical results, chain-of-custody <br /> documentation,a summary of field observations, and coliclnsions. This report will be <br /> submitted to the SJCEF D within 6 to 8 weeks ofreceiviAg all analytical sample results <br /> from the laboratory- <br /> I£there are any questions regarding the contents of this vi ork plan,please call us at(916) <br /> 364-1884. i <br /> Sincerely, <br /> SECOR International Incorporated <br /> o er a <br /> Project Geologist4 <br /> ,pt CsRE[3 � <br /> BARCLAY <br /> �j <br /> I y�� Na.526a <br /> I <br /> Greg Barclay R s 6260 <br /> ofi ea��C"� <br /> Technical Coordinator <br /> Attachments: Figure 1 - :Site Map <br /> Attachment A - Field and Laboratory P,;rocedures <br /> Attachment B - Site Health and Sajbty.Plan <br /> cc: Mr.Paul Supple, ARCO Products Company <br /> Mr.Mark List,RWQCB -Central Valley Region <br /> 7G66d-019-04NIfPW�1 <br /> 1 <br /> i <br />