My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 6:04:04 PM
Creation date
2/6/2020 3:25:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> Boyett Petroleum <br /> 419 S. Main, Manteca <br /> 10/85 Three 10,000 gallon double walled gasoline underground storage tanks <br /> (USTs) were installed at the site. <br /> 11/20/96 The UST piping was removed (less than 10feet)_ and soil samples were <br /> collected under the dispensers at two feet below surface grade (bsg) on <br /> this date. Contaminants were found in the soil samples. <br /> 01/02/97 A Notification of Hazardous Waste Discharge was filed on this date. <br /> 01/06/97 An Unauthorized Release Report was filed on-this date. <br /> 01/07/97 The site was placed in the Local Oversight Program on this date. <br /> 10/05/98 Two geoprobe borings were advanced to 18 feet bsg on this date. <br /> 10/23/98 Date of the '.,Underground..Storage Tank Preliminary Investigation Report <br /> of Findings" that discusses the work performed in October 1998. <br /> Contamination was found in thesoil and groundwater. <br /> 8/27-30/99 Monitoring wells MW1� through MW 4 were installed during this time. <br /> Depth to water was about 16 feet. <br /> 10/27/99 Date of the "Report of Findings" that discusses_ the work performed in <br /> August 1999. <br /> 12/20-22/00 Monitoring wells MW5 through MW8 were installed during this time. <br /> 01/15/01 Date of the "Interim Report of Findings" that, discusses the work <br /> performed in December 2000. <br /> 02/02/01 Cone Pentrometer Test wells CPT1 and CPT2 were advanced to 76 feet <br /> on this date. <br /> 02/07/01 Date of the report that discusses the work performed in February 2001. <br /> 04/25/01 Monitoring well 'MW9 (deep screened interval from 40 to 50 feet) was <br /> installed on this.date. <br /> 06/29/01 Date of the "Final Report of Findings" that discusses the work performed <br /> in April 2001. <br /> 11/20/02 Date of the Well Survey report prepared for this site. <br /> 10/20-23/03 Cone Pentrometer Test wells CPT3 through CPT6 were advanced to <br /> depths of 65. to 125 feet and Hydropunch wells HPI through HP5 were <br /> advanced to 28 feet during this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.