My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004448
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
ARCHIVED REPORTS_XR0004448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:44:25 PM
Creation date
2/6/2020 3:50:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004448
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Groundwaterinvestigation,Monitor well Destruction and Installation,and Interim Remediation Pump Test Report <br /> Soyett Petroleum,419 S.Main St.,Manteca,CA <br /> ' January 30,2004 <br /> Page 14 <br /> Table 6 Monitoring Well Survey Details <br /> ' <br /> EM�onitoringr X Y Z <br /> (elevation) <br /> MW-4R 37.7935465 -121.2164386 35.21 <br /> MW-10 37.7936403 -121.2167629 36.09 <br /> MW-11 37.7936012 -121.2167628 36.15 <br /> EW-1 37.7936536 -121.2I69281 36.23 <br /> 4.5 MONITORING WELL DEVELOPMENT <br /> ' On November 14, 2003, wells EW-1 and MW-11 were developed by surging and bailing the groundwater <br /> in the well with a surge block and disposable, polyethylene bailers. MW-4R and MW-10 were dry. A total <br /> of ten well-bore volumes were removed from each well during development. The water purged from the <br /> ' two wells was brown in color with moderate clarity and improved to clear with good clarity during <br /> development. <br /> No floating product or sheen was observed and no petroleum hydrocarbon odors were noted in the <br /> groundwater purged from wells EW-1 and MW-I 1 during well development. The wells were purged until <br /> the temperature, electrical conductivity, and pH of the water stabilized. <br /> ' All well-development equipment was cleaned prior to use by washing in a solution of laboratory-grade, <br /> non-phosphate detergent and deionized water, and double rinsing with deionized water. The purge water <br /> '. discharged from the wells during development was placed in 55-gallon drums, sealed, labeled, and left on <br /> site where they will remain pending laboratory analyses. Groundwater Well Development Field Forms are <br /> included in Appendix B. <br /> 1 5.0 WELL PUMP TEST <br /> From November 18 through 21, 2003, Condor conducted a 72-hour constant rate pump test of monitoring <br />' well MW-11. Pump testing was conducted to determine the short-term pump rate that could be maintained <br /> from the aquifer while maintaining a stable drawdown. The results of the pump test will be used to size <br /> system components for a pump and treat remediation system to be installed at the site. This section <br />' includes a description of the site preparation and pump test. <br /> 5.1 SITE PREPARATION <br />' Condor received an Industrial Wastewater Discharge Permit (IWDP) from the City of Manteca"(City) <br /> Public Works and the necessary permit from City Building Inspection Division prior to installation of the <br /> pump test equipment. The pump and carbon canisters were fenced off and barricades were placed around <br />' the monitor wells used as observation wells to protect the transducer equipment. Condor received <br /> permission from the City Public Works Department prior to discharging the treated groundwater directly <br /> to the sanitary sewer system The IWDP can be renewed after installation of the pump and treat systerrl. <br />' 5.2.. MW-11 PUMP TESTING. <br /> Pumping from monitoring well MW-11 using a submersible pump began at 1250 hours on November 18, <br /> a 2003. and continliecl_ iininti-minted lmH1 lA1A ],r,,,c nn NTn ._1.a. 71 7nM (ll 4: ...r I-- I-- <br /> _1-1 — -- - •-- ..,,__ .. ., .,...�. .. �., x0031, VU-3M vauvua vx uic iicau <br /> pressure response were electronically recorded with transducers placed in EW-1, MW-9, and MWA 1. A <br /> . total of 38,316 gallons of water were pumped during this period_ Groundwater pumped from MW-11 was <br /> 1 <br />' �� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.