My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
446
>
2900 - Site Mitigation Program
>
PR0543884
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 10:55:02 AM
Creation date
2/10/2020 9:14:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543884
PE
2959
FACILITY_ID
FA0024952
FACILITY_NAME
GLEASON PARK APARTMENTS
STREET_NUMBER
446
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14926216
CURRENT_STATUS
02
SITE_LOCATION
446 S AMERICAN ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH AND SAFETY PLAN AND SOIL MANAGEMENT PLAN <br /> GLEASON PARK APARTMENTS PROPERTY <br /> E. Church, S. Stanislaus, and S. American Streets <br /> Stockton, California <br /> TABLE OF CONTENTS <br /> INTRODUCTION.......................................................................................................................................................1 <br /> SITE LOCATION AND DESCRIPTION.................................................................................................................2 <br /> BACKGROUND .........................................................................................................................................................2 <br /> ANTICIPATED FUTURE SITE ACTIVITIES AND POTENTIAL HAZARD...................................................3 <br /> RESPONSIBILITIES AND CONTACT INFORMATION....................................................................................4 <br /> HEALTH AND SAFETY PLAN (HSP)....................................................................................................................5 <br /> GENERAL...............................................................................................................................................................5 <br /> SAFEWORK PRACTICES..................................................................................................................................5 <br /> EMERGENCYRESPONSE..................................................................................................................................6 <br /> SOILMANAGEMENT PLAN..................................................................................................................................7 <br /> GENERAL...............................................................................................................................................................7 <br /> SITECONTROL MEASURES.............................................................................................................................7 <br /> REMOVAL OF SOIL OR OTHER SUBSURFACE MATERIALS FROM PROPERTY..............................8 <br /> CHANGES OR REVISIONS TO THIS PLAN........................................................................................................9 <br /> CLOSING....................................................................................................................................................................9 <br /> ATTACHMENTS: <br /> Plate I,Vicinity Map <br /> Plate 2,Plot Plan <br /> Hospital Directions <br />
The URL can be used to link to this page
Your browser does not support the video tag.