My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1627
>
2900 - Site Mitigation Program
>
PR0542026
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 12:37:08 PM
Creation date
2/10/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542026
PE
2950
FACILITY_ID
FA0024123
FACILITY_NAME
WESTCORE II ARMY COURT LLC
STREET_NUMBER
1627
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334003
CURRENT_STATUS
01
SITE_LOCATION
1627 ARMY CT
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location Job Function Level of Protection <br />Controlled area Drilling A BCD Other <br /> A BCD Other <br />A BCD Other <br />Specific protective equipment for each level of protection is as follows: <br />Level A <br />Fully-encapsulating suit <br /> <br />Level C <br />Splash gear <br /> <br />SCBA Full-face canister respirator <br />Disposable coveralls Mouth/nose canister respirator <br /> <br />Level B <br />Splash gear <br /> <br />Level D <br />Hard hat <br /> <br />SCBA Ear plugs <br />Neoprene gloves <br />Safety vests <br />Hard toe boots <br />Safety glasses <br />Other: <br />If air-purifying respirators are authorized, a suitable half mask dual element respirator with cartridge <br />(organic vapors) is the appropriate canister for use with the involved substances and concentrations. A <br />competent individual has determined that all criteria for using this type of respiratory protection have <br />been met. <br />NO CHANGES TO THE SPECIFIED LEVELS OF PROTECTION SHALL BE MADE WITHOUT THE APPROVAL OF <br />THE PROJECT TEAM LEADER. <br />G. ON-SITE WORK PLANS <br />Work parties consisting of persons listed below will perform the following tasks: <br />Function <br />Field Team Leaders Diego Vasquez Overseeing operations, <br />call for emergency services <br />Work Party #1 Cascade Drilling, L.P. Overdrilling Monitoring Wells <br />100834003 H&S 3
The URL can be used to link to this page
Your browser does not support the video tag.