My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2900 - Site Mitigation Program
>
PR0541264
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:42:11 AM
Creation date
2/10/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541264
PE
3528
FACILITY_ID
FA0023641
FACILITY_NAME
FORMER HOLLY SUGAR FACILITY
STREET_NUMBER
20500
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
20500 HOLLY DR
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Destructions Work Plan 7 September 2016 <br /> Former Holly Sugar Facility Page 2 <br /> 20500 Holly Drive <br /> Tracy, California <br /> Langan Project: 731575102 <br /> • Over-drilling four 4-inch diameter PVC wells to 21, 31, 36, and 45 feet below ground <br /> surface (bgs). <br /> • Over-drilling three 6-inch diameter PVC wells to 33, 35, and 100 feet bgs. <br /> • Tremie grouting each of the seven drilled-out wells to surface with neat cement grout. <br /> • Surface completion will consist of native soil from the well area. <br /> Our work plan includes the following assumptions: <br /> • Over-drilling and grouting the seven wells will be completed within 3'/2 days. <br /> • Cuttings generated during over drilling activities will be spread around the site. <br /> • Debris generated during well abandonment (grout, well casing, and well boxes) will be <br /> drummed up and disposed as construction waste or scrap metal, respectively, with no <br /> special handling requirements. <br /> REPORTING <br /> Langan will prepare a well destruction completion report that will describe the field activities <br /> and document the well destruction methods and procedures. The report will be submitted to <br /> the SJEHD for their files. <br /> SCHEDULE <br /> It is anticipated that the well destruction outlined in this work plan can be completed within <br /> approximately 3 weeks of receiving a permit from the SJEHD. <br /> If you have any questions, please do not hesitate to call. <br /> Sincerely yours, <br /> Langan Treadwell Rollo <br /> Tyler Houghton Jeffrey F. Ludlow, PG <br /> Senior Staff Geologist Principal <br /> Attachments: Figure 1 Site Plan <br /> SJEHD Site Mitigation Master File Record Information Form <br /> SJEHD Site Mitigation Well & Boring Permit Application and Woodward <br /> Certificate of Insurance <br /> Langan Check for SJEHD Well Destruction Processing Fees <br /> cc: Steve Cortese— Cortese Real Property <br /> 731575102.01 JFL_Work Plan <br /> LANGAN TREADWELL ROLLO <br />
The URL can be used to link to this page
Your browser does not support the video tag.