Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> MUI <br /> TYPE OF ACTION F11.NEW PLAN ❑ 2.CHANGE OF INFORMATION MM <br /> PIAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> -I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> MU) <br /> FACILITY NAME 1 S K (.•L <br /> FACILITY SITE ADDRESS, B.p m t L l4 N1� a CITY T�r7 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE Mau< <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)13e performed in <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. Mlrf <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of-each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan ma etc. which shows all required information,include it with this Ian. <br /> IV. TANK MONITORING <br /> MI(1. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> $'L CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) M11. <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY �( LIQUID F�LLED ❑ c.UNDER PRESSUR�L( d.t�NDE,R,V�A�CUUM M13 <br /> M 12. MODEL#: �j <br /> PANEL MANUFACTURER: -r� MIS. <br /> r Mid. MODEL#(S)' _ k0= <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANtK(Sl MODEL#: M17 <br /> PANEL MANUFACTURER: M19 <br /> IN-TANK PROBE MANUFACTURER: Mfg. MODEL#(S): <br /> M20 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M21 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> Mn M27 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> - M24. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL.PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL.TANK GAUGING(MTG)PER 23 CCR§2645 M25 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26 M27 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Regoiree agency approval) M28 <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M3U <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)rrRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31 <br /> SECONDARY CONTAINMENT IS: �a. Y _Z1 LI ID FILLED ❑ c.UNDER PRESSU ❑ d UNDER VACUUM M33. <br /> PANEL MANUFACTURER: V E7 M32. MODEL#: S 3 �D M35. <br /> . <br /> LEAK SENSOR MANUFACTURER: MiaMODEL#(S): �� <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? (Ia.YES (3b.NO M3' <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? X a.YES ❑ b.NO <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED Mas M39. <br /> MLLD MANUFACTURER(s): MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECT,O�.(EL D)TI-LAT R TINE PERFORMS 3.0 g.p.h.LEAK TESTS rn , P �<DV i Mal <br /> ELLD MANUFACTURER: N C � M40 MODEL#:JFLP a Z <br /> M42 <br /> PROGRAMMED LINE INTEGRITY TESTS: Ela.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN. 01 <br /> a.YES ❑ b.NO Mai' <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? Ia a.YES ❑ b.NO <br /> M44. <br /> ❑ 4.INTEGRITY TESTING <br /> fy) M43. M46. <br /> TEST FREQUENCY: [I a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ t1.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED•• M47 <br /> •Reywroe agenry approval ••Allowed ror monitoring or unburied amargency generator fuel piping only per HSC§25281 S(bX3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> Moa <br /> ❑ 99.OTHER(Specify) <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />