My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 7 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) MS° <br /> 1A 1.CONTINUOUS ELECTRONIC MONITOKIN(aOF UNDER�SP ' SER NTAINMENT(UDC) T <br /> PANEL MANUFACTURER. _' C i T— Msl. MODEL#: + L S 3 SM M32. <br /> LEAK SENSOR MANUFACTURER: 1/ MS3 MODEL#(S): j Zr M54 <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? 9 a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? 4C a.YES ❑ b.NO Ms6. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 1A a.YES ❑ b.NO M37. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M511. MODEL#(S): M5e. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Re4wresayency approval) M60 <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ I.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) MNo <br /> I THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2 ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3 ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4 ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5 ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7 ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> y') ❑ OTHER(Specify): <br /> MMI. <br /> Personnel with UST monitoring responsibilities are familiar with all ol'the above documents relevant to theirjob duties and can access those documents when needed. <br /> BN January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January I,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the leak detection equipment. <br /> r The facility employee's role with regard to spills and overfills. <br /> Y Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January I,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mills. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF I/I/05,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION – <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR '2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:Icertifyt t tie in rmation provided herein is true and accurate to the best ofmy knowledge. <br /> OWNER/OPERATOR SIGNATOR �.�RrP�ESENTINGDATE: M91. <br /> erMxlperator <br /> OWNFI OPERATOR NAMFZrint): M92 OWNER/OPERATOR TITLE: M73 <br /> AL. 1+ T..- 4V Gri OWN <br /> (.lgency Use Only) This plan has been reviewed and: ❑:1lipru cd ❑Approved With Conditions ❑DisapprovcJ <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> S-ICEHD-d(07/03)-3/4 ---- <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.