My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) 6perator <br /> • Monthly Visual Inspection Checklist <br /> Facility Namc: 99 Shell - Date: '9/3614) L• G 2 �: 4• <br /> kility Address:7700-Moreland Ct <br /> City: Stockton Zip Code: <br /> Designated UST Operator Conducting the Inspection: Lori Freshour <br /> International Code Council Certification#: 5220353=UC Expiration Date: 9/17/07 <br /> Si •ture: Phone: (916)826-1576 <br /> IL m M0NI'1)0MNG PANT L ALARM H191)0R Y N NA <br /> 1 Xf.mt ving system is powered on and in proper operating mode <br /> 2 Monitoring system is not currently showing alarms or warnings <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the Designated UST( x3ator. <br /> (Attach a copy of the alarm history report/log to this form if available) <br /> 4 Each alarm for the previous month has been responded to appropriately. <br /> 5 Sensors located in the tank-top containment sumps have not alarmed in the past month <br /> 5a list all tank-top sumps where alarms occurred to the past month: _— <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a quabfied service technician responded to,and <br /> properly addressed,the cause of the alarm_ Attach documentation venfymg appropriate service to this report. <br /> Ifsunip inspection is required,record results in item b,below. i4-- <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are Properly located <br /> Note:Visual of sumps is onlyr red in sumps where an alarm has ooaired in the t month kar which there is no service record <br /> Y N Y N <br /> Sump Location. Sump, <br /> Sump Location Sump Location: <br /> Sump Location: Sump Location: <br /> 7Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1-Contents t_ Contents n i L y <br /> _ Tank 2-Contents (ZG Tank 4-Contents Pi 4 <br /> 8 UDC areas are free of water,debris,and hazardous substance. Sensors properly located <br /> Y N NA Y N NA <br /> Dispenser 1/2 Dispenser 9110 <br /> Di riser 3/4 Dispenser 11/12 <br /> Di user 5/6 Di nser 12/13 ti!� <br /> Dispenser 7/8 Dispenser 14/15 <br /> PAPERWORK INSPECTION YN NA DATE DONE <br /> 9 Monitoting s tem cf6fication has been completed within tete past 12 months. --0-t7S <br /> 10 Seconds Contaimnent tests have been ' <br /> completed within the red timme <br /> efra . N r t <br /> 11 Spill containment structure Picket tesfiN was completed within the past yW. `- <br /> 12 Tank tightness testing was cornpleted within required timeframe. A <br /> 13 Line botness testing was completed with required timeframe. <br /> 14 Other required testing maintenance was completed within required (list test/maintenance items below <br /> Test/Maintenance: LjLp <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAIMW Y N NA <br /> 15 All facifaTooyees have received the required on-five-job bArung within ft past year. <br /> 16 Al facilitV employees hired within the past 30 day have received the reqwred on-tejoP train . ' KA <br /> Note:Any answer of"N"should be explained in the comment section on the following page,and will require follow-pp,action. <br /> Com ents: itt -- IZt�t l`:�nYY1 11C C S`; T(; G - (' (ltbCK�='d� bar '� l•i`X� � <br /> Gt2 ��L� • <br /> Follow-up action required: <br /> ..healer 1 Manager Signature: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.