My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designall Underground Storage Tank (UST) __derator <br /> Monthly Visual Inspection hecklist <br /> Facility Name: 99 Shell Date: to <br /> Facihly Address: 7700 Moreland Ct <br /> Cit : Stockton Zip Code: . • '°. <br /> l3csigmted UST Operator Conducting the Inspection: Lori Freshour <br /> International C90s Counc I Certification#: 5220353-UC Ex irationDate:'9/17/07 <br /> Si tire: Phone: (916)826-1576 <br /> Item MONITORING PANEL ALARM HLSMRY Y N NA <br /> 1 Monitoring system is powered on and in proper operating mode <br /> 2 Monitoring system is not currently showing alarms or warnings <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the Designated UST Operator. <br /> (Attach a copy of the alarm history report/log to this orm if available) <br /> 4 Each alarm tar the previous month has been responded W appropriately. <br /> •5 Sensors located in the tank-top containment swmps have not alarmed in th past month <br /> 5a list all tank-top sumps where alarms occurred to the past month: _ <br /> Note:Sumps where an alarm has occurred in the past month must be lnspmled unless a qualified service technician responded to,and d <br /> properly addressed,the cause of the alarm. Attach documentation verifying appropriate service to this report '1 <br /> If suTp ins non is required,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are properly located <br /> Note Vk-uWtoonotsumpgjsordyreWredin sumps where an alarm has omued in the t month for which there is no service recced <br /> Y I N Y N <br /> Sump Location: $ump Location: <br /> Sump Location. 'Sump Localion.- <br /> Sump Location: Sump Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance:. <br /> Y I N NA I Y N NA <br /> Tank 1-Contents At_ Y I j Tank 3-Contents E <br /> Tank 2-Contents p I yj I Tank 4-Contents <br /> •.., 8 UDC areas are free of water,debris,and hazardous substance. Sensors are properly located <br /> Y N NA Y N NA <br /> Dr 1/2 DiSpeWr 9/10 6141 <br /> D. nser 3/4 Dispenser 11/12 N <br /> Dispenser 5/6 Di' nser 12/13 k <br /> Dispenser 7/8 Poenser 14/15 <br /> PAPERWORK INSPECTION Y H NA DATE DONE <br /> 9 Monitoring tem certification has been completed within the past 12 months. -p <br /> 10 Secondary Contairrrtent tests have been completed wittin the regured timeframe. y &)Zl ill <br /> 11 Spill containment structure et testing was completed within the past year <br /> 12 Tank tightness testing was completed within required timeframe. <br /> 13 Line fightriess tesfing was cornpleted with required timeframe. INA <br /> 14 Other required testing maintenance was cornpleted within required timeframe. List test/maintenance items below <br /> Test/Maintenance: --q•p <br /> Test/Maintenan e: <br /> Test/Maintenance: i <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility have received the recluired on-too training within the past <br /> 16 t.AJI facility tired wittin the past 30 day have received the rewired qn-thajob training <br /> Note:Arry answer of"N"sWd be explained in the comment section on the following page,and will require follow-up action. <br /> '-Comments: ' • <br /> Follow-up action required: <br /> 1 <br /> Dealbr/Manager Signature: :pate: <br />
The URL can be used to link to this page
Your browser does not support the video tag.