Laserfiche WebLink
MONITIRING SYSTEM CERTL DATION <br /> CERTIFICATION / TEST DATE: August 1, 2006 <br /> Al. FACILITY A2. OWNER <br /> Name 99 Shell Name Angle Enterprises <br /> Address 7700 Moreland Court,Stockton, CA 95212 Address 35584 Conavan Lane, Fremont, CA 94536 <br /> Phone# 209-939-1906 Phone# 510-552-4822 <br /> Contact Balaji Angle Contact Balaji Angle <br /> F. IN-TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ NO* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all Items on the equipment manufacturers maintenance checklist completed? <br /> _i - <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* For equipment start-up Or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ NIA (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No- Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No" Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No- For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ■ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ■ Yes 0 No* For electronic LLD9,does the turbine automatically shut off If any portion of the monitoring system Is disabled <br /> ❑ WA or disconnected? <br /> ■ Yes ❑ NO* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ❑ NIA <br /> ■ Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> C,2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />