My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
504/448
>
2900 - Site Mitigation Program
>
PR0528168
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:04:50 AM
Creation date
2/10/2020 4:03:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0528168
PE
2960
FACILITY_ID
FA0019070
FACILITY_NAME
CITY OF STOCKTON REDEVELOPMENT
STREET_NUMBER
504/448
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13737003 / 02
CURRENT_STATUS
01
SITE_LOCATION
504/448 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ak <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, Califomia95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:www.siaov.orglehd <br /> Underground Storage Tank Program inspection Report <br /> Facility Name: Facility Address: Date: <br /> TOKP.Y SHELL' 420 W ` 20. 2016 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply( <br /> Item# Remarks <br /> i u6 CCR 2632 Monitoring and response plans not current or approved by the EHD. <br /> The monitoring plan is not current and/or not approved by the EI oe monitoring plan for the gas and diesel <br /> tanks indicates"Yes"for UDC Monitoring Stops Flow of Product at Dispenser. This should be marked as"No". <br /> The monitoring plan for the diesel tank lists MLLD Manufacturer Red Jacket MLLD Model FX IV D. Manufacturer <br /> should be listed as VMI and Model should be listed at 99LD2000. <br /> The monitoring plan for the used oil tank indicated Periodic System Testing"Yes"for Secondary Containment <br /> Testing. This should be listed as"No". <br /> The monitoring plan for the used oil tank lists Leak Sensor Model#302. This should be listed as 301. <br /> The monitoring plan must be uploaded to the California Environmental Reporting System(CERS). Immediately log <br /> into CERS, make the necessary changes, and submit for review by the EHD. <br /> The response plan is not current andfor not approved by the EHD. Section V. of the response plan has not been <br /> completed. The completed response plan must be uploaded to the California Environmental Reporting System <br /> (CERS). Immediately log into CERS, upload the completed form, and submit for review by the EHD. Ensure a copy <br /> is available for inspection at any time. <br /> This is a minor violation. <br /> 107 CCR 2632(d)(1)(C) Plot plan/sfte map not submitted or failed to completely show where monitoring is performed. <br /> An accurate UST Monitoring Site Plan was not submitted. The site plan does not indicated the line leak detectors.A <br /> site plan must be submitted identifying the locations where monitoring will be performed. Immediately log into the <br /> California Environmental Reporting System (CERS) at http://cers.calepa.Ga.gov/and upload a copy of the UST <br /> Monitoring Site Plan. <br /> This is a minor violation. <br /> 110 CCR 2637(e) Failed to submit secondary containment test report within 30 days. <br /> Secondary containment testing was performed on 1-19-15 and a test report was submitted on 4-10-15, more than <br /> 30 days after the test. A copy of the test report must be submitted within 30 days of the tests. Take all necessary <br /> precautions to ensure testing and submittal of test reports are performed in a timely manner. <br /> This is a minor violation. <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days. <br /> Annual monitoring system certification, leak detector testing, and spill container testing was performed on 1-20-15 <br /> and a test report was submitted on 3-30-15, more than 30 days after the test. A copy of the test report must be <br /> submitted within 30 days of the tests. Take all necessary precautions to ensure testing and submittal of test reports <br /> are performed in a timely manner. <br /> s is a repeat violation, Class II. <br /> Received by Inspector: hone: ate: <br /> (initiall: ARIS VELOSO, Senior RENS (209)468-3453 01/20/2016 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.