Laserfiche WebLink
CAMBRIA <br /> Work Tasks <br /> Permit: An appropriate permit for well destruction will be obtained from SJCEHD. <br /> Site Safety Plan: Cambria will prepare a Site Safety Flan for field work. <br /> Utility Clearance: Cambria will mark proposed drilling locations and the locations will be <br /> cleared through Underground Service Alert prior to drilling. <br /> Well Destructions: The groundwater monitoring wells (MW-5, MW-6, and MW-8) and SVE <br /> wells (VE-1,VE-2, and VE-3) will be destroyed by over-drilling. The wellhead vault boxes will <br /> be removed and the wells will be over-drilled with twelve-inch hollow-stem augers (the wells <br /> were originally drilled with 10-inch augers) to two feet below the completed well total depth. <br /> Then the resulting borings will be backfilled with neat cement grout to grade. The grout will be <br /> topped with asphalt patch. A Cambria geologist will supervise well destruction activities. <br /> Report Preparation: Following completion of well destruction activities, Cambria will prepare a <br /> written report documenting these activities. <br /> The scope of work described in this. work plan will be performed under the supervision of a <br /> registered geologist or engineer. <br /> Schedule <br /> Cambria is prepared to begin work upon written approval of this work plan by SJCEHD and <br /> receipt of an appropriate drilling permit. <br /> 1346 2 <br />